HQ

プレスリリース・ニュース

 

 

新着情報

    05
     
    9月
    Kobe

    ニュース記事

    国際フロンティア産業メッセ2024

    国際フロンティア産業メッセ 2024は、西日本最大級の産業総合展示会です。関西エリアを中心とした企業や大学・研究機関の出展社による先端技術の紹介や新事業創出の基盤となる製品が展示されます。ペリー・ジャパン株式会社は、神戸市(ドイツパビリオン)に出展します。
    04
     
    7月
    The immersed tunnel has a total width of 42,00 m and comprises five tunnel corridors. PERI supplied the formwork to produce the 79 standard tunnel elements, each 217,00 m in length and weighing 73.000 t.
(Photo: Femern A/S)
    The 79 standard tunnel elements are manufactured in three halls across five production lines. All five production lines, each comprising over 250,000 parts, were successfully assembled and are in operation.
(Photo: Femern A/S)
    After the production of the segments, they are transported on the sea and lowered at their final spot.
(Photo: Femern A/S)

    プレスリリース

    Important Milestone reached in the Fehmarnbelt Tunnel project: All five production lines for standard tunnel elements in operation

    At the time of its completion, the 18 km long Fehmarnbelt Tunnel will be the longest immersed tunnel in the world and is currently the largest infrastructure project in Northern Europe. PERI developed a formwork solution for the production of the 79 standard tunnel elements, characterized by high performance, productivity and compliance with high safety standards. The standard tunnel elements are manufactured in parallel on five production lines, with the latest line having commenced operations in February 2024.
    29
     
    5月
    The portfolio of Mabey Hire Ltd. includes groundshoring for excavations, propping and jacking for renovation, temporary bridges for access and sensors for all phases of construction projects.
    Mabey Hire Ltd. is a market leader in the UK, providing solutions for infrastructure and renovation construction projects.
    Mabey Hire Ltd. is a market leader in the UK, providing solutions for infrastructure and renovation construction projects.

    プレスリリース

    Mabey Hire Ltd. becomes part of the PERI Group

    With effect from 21.05.2024, the PERI SE (Weissenhorn, Germany) has taken over Mabey Hire Ltd., headquartered in Dewsbury (UK).
    17
     
    4月
    Danjiang Bridge

    プレスリリース

    Above water and clouds: Danjiang Bridge reaches record-breaking proportions with PERI Systems

    The Danjiang Bridge over the Tamsui River on the outskirts of Taipei is taking giant strides towards record-breaking proportions. The structure, designed by Zaha Hadid, is expected to be the world’s longest asymmetric cable-stayed bridge upon completion in 2025, at an impressive 920.00 metres.
    28
     
    3月
    An outpouring of joy: More than 200 children from Kiberia celebrated new prospects for the future at the opening ceremony.
    Andreas Mayer and Dr Jürgen Mayer from PERI attended the opening ceremony in Kenya. Amidst a varied entertainment programme, they gave speeches expressing their best wishes.
    The new PERI school building in Kibera consists of several thousand TwistBlocks.

    プレスリリース

    Opening of new school in Kenyan slum: The very first PERI school provides opportunities for the future

    In Kenia wurde die erste Schule im Rahmen des PERI Nachhaltigkeitsprogramms feierlich eröffnet

    The very first PERI school in Kenya opened its doors at the end of February 2024 for over 200 children. In Kibera, the largest slum in Nairobi, the first school in the PERI sustainability initiative “Building Sustainability” was built in less than a year. In collaboration with the social enterprise “Start Somewhere”, PERI developed what are known as TwistBlock Moulds for hollow concrete blocks, which were designed specifically for use in slums due to the simple and flexible manner in which they can be used. The new school building has created not only learning spaces, but also new local job opportunities.
    20
     
    3月
    PERI is member of buildingSmart International
    Since 1 March 2024, PERI SE has been a member of the global umbrella organisation for openBIM - buildingSMART International.
    buildingSMART summit

    プレスリリース

    PERI is a member of buildingSMART International

    • PERI SE is a member of buildingSMART International and in local chapter buildingSMART Deutschland • Common openBIM approach for formwork and scaffolding construction • Design and implementation of openBIM in the construction process
    13
     
    2月
    Major technical calculations had to be carried out to construct the complex apex of the building. All framework conditions had to be considered – from wind and weather to the safety of the workers on the scaffolding and passers-by.
    The ACS Self-Climbing System was used for the first time in Denmark for the Lighthouse 2.0, having already proven its worth in numerous construction projects worldwide.
    The rail-guided climbing formwork scored points with its hydraulic drive, large climbing units, high lifting force and rapid processes, which meant that a concreting cycle of just one week per storey could be achieved.

    プレスリリース

    Award for Denmark’s tallest residential building

    The “Lighthouse 2.0” construction project has created new living space with 381 new flats in the purpose-built district of “Aarhus Ø”, not far from the centre of the city of the same name. With its impressive height of 142 metres, the building has been the tallest residential building in Denmark since its completion in 2022. The top floors are home to a restaurant and a roof terrace that is open to the public – with fantastic views of the harbour, the sea and the city. The project has now received an award for the “Best Tall Building” in the “100 to 199 metres” category from non-profit organisation, the “Council on Tall Buildings and Urban Habitat” (CTBUH).
    13
     
    12月
    The 26 m high rear tower was a complex structure as it could not be tied and anchored in the usual way. There was also a historic statue in the centre of the scaffolding that needed to be protected. (Photo: PERI SE)
    In addition to the elements of the PERI UP Scaffolding Kit, VT girders and 3-ply plywood were used to form various platforms, while SRU steel walers and tie rods were applied for anchoring the scaffolding to the counterweights. (Photo: PERI SE)
    Multiple access points were created to support the safe execution of the choreography planned for the event. With the PERI UP Scaffolding System, these internal passages could be realised without problems. (Photo: PERI SE)

    プレスリリース

    Visionary stage design realised with 200 tonnes of PERI UP scaffolding

    World Youth Day (WYD) is an international event where young people from all over the world gather every two or three years to meet the Pope. Founded by Pope John Paul II, WYD was first held in Rome in 1986 and has since been held in numerous cities around the world. In 2023, the event was organised in Lisbon during the first week of August and attracted around 1.5 million participants.
    20
     
    9月
    PERI is playing an instrumental and successful role in Groß & Partner’s “FOUR Frankfurt” inner-city project with a wide range of systems for formwork and scaffolding applications, not to mention climbing technology that is subject to the most stringent safety regulations and a sophisticated logistics concept.

    プレスリリース

    Four towers grow at once thanks to PERI systems

    Four up to 233-m-high futuristic towers will soon soar high into the heart of Frankfurt’s skyline in keeping with the project’s slogan “Feel the City”. PERI is playing an instrumental and successful role in the FOUR Frankfurt inner-city project with a wide range of systems from the formwork, scaffolding and climbing technology segments subject to the most stringent safety regulations and a sophisticated logistics concept.
    13
     
    1月
    With effect from 1 January 2023, PERI Vertrieb Deutschland GmbH & Co. KG has acquired Implenia Schalungsbau GmbH in Bobenheim-Roxheim, Germany.

    プレスリリース

    PERI acquires Implenia Schalungsbau GmbH

    With effect from 1 January 2023, PERI Vertrieb Deutschland GmbH & Co. KG has acquired Implenia Schalungsbau GmbH in Bobenheim-Roxheim, Germany. For the time being, the company will be managed under the name PERI Schalungsbau GmbH as a subsidiary of PERI Germany.
    01
     
    1月
    The A26 project stands out on account of its five different tunnel cross-sections. In addition, the bends feature tight radii of 50 m to 750 m and the tunnel gradients vary, making it difficult to implement the new transport network.
    To construct the 1,600-m-long access tunnel, PERI engineers developed the first customised and fully hydraulic special-purpose formwork carriage. This alone was sufficient to construct the different cross-sections in a total of 170 concreting sections.
    Given the fact that the very tight curve radii made it difficult to transport the tunnel carriage, an innovative caterpillar system was used to move it.

    プレスリリース

    Various tunnel cross-sections with first fully hydraulic formwork carriage with caterpillar drive

    The A26 project is one of the most important infrastructure projects in the Austrian city of Linz and the surrounding area with the goal to ease congestion on its urban transport network. The key to success during the project implementation stage was a PERI engineering solution that was innovative, safe and efficient in equal measure, coupled with comprehensive project support. The highlight: The first fully hydraulic tunnel formwork carriage with a caterpillar drive in Austria.
    02
     
    12月
    PERI assisted with the construction of the 550-m-long and 27-m-wide drive-by platform by providing a customised formwork carriage solution.
    The 15,300 m² bridge area is supported by 70 V-shaped columns at a height of over 10 m.
    The 70 V-shaped columns were also constructed with the help of PERI formwork systems.

    プレスリリース

    Customised formwork carriage cuts construction time by several months

    At the south end of Frankfurt Airport, Terminal 3, with its futuristic design, is currently one of Europe’s largest infrastructure projects. Upon completion of construction in 2024, up to 19 million travellers will be able to arrive at and depart from the three new gates each year. PERI assisted Max Bögl with the construction of the drive-by platform, which will in future provide passengers with direct access to the departure level of Terminal 3. 
    22
     
    11月
    PERI is now reflecting on a very successful trade fair, having showcased numerous innovations from the formwork and scaffolding sector, and held exciting talks and discussions.
    With more than 200,000 guests, the PERI exhibition hall at bauma 2022 was a visitor magnet.
    The experts from PERI provided insight into the future of the tried-and-tested MAXIMO Panel Formwork, which is impressive in terms of efficiency and sustainability.

    プレスリリース

    PERI is reflecting on a successful bauma 2022

    With more than 200,000 visitors, the PERI exhibition hall at bauma 2022 was a visitor magnet. PERI is now reflecting on a very successful trade fair featuring numerous innovations from the formwork and scaffolding sector as well as exciting talks and discussions. In addition to a comprehensive facelift for the MAXIMO Panel Formwork, additions to the PERI UP Scaffolding Kit and ground-breaking key digital technologies, PERI showcased alternative and sustainable construction methods using MESH technology and TwistBlock Moulds.
    27
     
    10月
    The innovative split-soffit striking method speeds up the cycle time enormously, meaning that fewer formwork sets are required. (Photo: Greg Folkin Photography)
    With VSS, the side formwork can be used independently. This means that the deshuttering process can be carried out the following day and that the reinforcement work can be carried out conveniently. (Photo: Greg Folkin Photography)
    The innovative connection technology using X-Bolts and T-Bolts enables fast assembly and disassembly of the formwork. (Photo: Greg Folkin Photography)

    プレスリリース

    Innovative VARIOKIT Pier System – High performance for bridge pier construction

    Simultaneously to bauma 2022, PERI will be presenting the VARIOKIT Pier System, a system on the market which aims to revolutionise bridge construction. PERI, one of the leading manufacturers and suppliers of formwork and scaffolding systems for the modern construction sector, is setting a new standard in bridge construction with the introduction of VARIOKIT Pier System (VPS). VPS brings together safety and efficiency to provide a versatile, high-performance system for the construction of bridge piers and pier caps. VPS is based on the VARIOKIT Engineering Construction Kit, which means that almost all project requirements can be met using rentable solutions.
    24
     
    10月
    Digital solutions from PERI have their finger on the pulse and help companies actively counteract the shortage of skilled workers in the construction industry. They create more ergonomic, cleaner and safer working conditions with automated work processes.
    The innovative MESH technology is among the finalists in the digitalisation category of the bauma Innovation Award. The MESH technology makes it possible to produce complex or curved reinforcement cages, which in the past were manufactured with elaborate manual work, through an automated prefabrication process. (Photo: MESH AG)
    With the MESH technology, complex reinforced concrete components can be created entirely without formwork.
(Photo: MESH AG)

    プレスリリース

    Shaping the future: PERI presents innovative technologies for more efficiency

    With the motto “Shaping the future”, the PERI exhibition hall will open its doors on the open-air North site (Booth FN 719) at bauma 2022 in Munich from 24 to 30 October 2022. In addition to innovations from the formwork and scaffolding sector, PERI will present digital technologies for the construction projects of tomorrow. Visitors can look forward to a variety of digital planning tools, innovations in PERI InSite Construction sensor technology, the new myPERI Customer Portal and a live demonstration of 3D Construction Printing. The MESH technology, which is among the finalists for the bauma Innovation Award, is celebrating its première.
    24
     
    10月
    The modular PERI UP Facade Scaffold now has an even higher load-bearing capacity and offers greater flexibility thanks to the EVOTOP series. In addition to the introduction of further sophisticated standard assemblies, a significantly reduced number of components and ties is a major advantage in use.
    Thanks to the EVOTOP series from the PERI UP Scaffolding Kit, even wider, longer and higher facade scaffolds can be built in demanding load classes. Heavy and inflexible frames are therefore no longer required in facade scaffold construction.
    PERI UP Cladding is a newly conceived, flexible enclosure system that is the perfect addition to the PERI UP Scaffolding Kit. It helps in providing a spatial enclosure for the construction site, while being an easy-to-install and translucent shield for the construction site personnel and the surrounding area.

    プレスリリース

    Achieving success in the scaffolding trade with PERI innovations

    With the motto “Shaping the future”, the PERI exhibition hall will open its doors on the open-air site North (booth FN 719) from 24 to 30 October 2022 in Munich. A number of innovations that make scaffolding construction quicker, safer and more economical will be showcased. Something that is always at the heart of PERI’s developments is the long-term and sustainable success of the scaffolding contractor.
    24
     
    10月
    With the motto “Building Sustainability”, visitors can experience first hand how sustainability is promoted at PERI during their visit to the trade fair.
    Visitors to the PERI exhibition hall can look forward to a comprehensive facelift for the tried-and-tested MAXIMO Panel Formwork.
    PERI will present further additions to the tried-and-tested MAXIMO Panel Formwork at the bauma. The MAXIMO Shaft Corner is being supplemented by a new striking module that saves energy and enables efficient striking of the shaft corners.

    プレスリリース

    Shaping the future: PERI presents innovations for the construction industry at bauma

    With the motto “Shaping the future”, the PERI exhibition hall will open its doors on the open-air North site (booth FN 719) at bauma 2022 in Munich from 24 to 30 October 2022. With a facelift of the tried-and-tested MAXIMO Panel Formwork, innovations from the slab formwork sector as well as new digital and disruptive technologies, such as the PERI InSite Construction sensors, 3D Construction Printing and the MESH technology, the formwork and scaffolding manufacturer is preparing the construction industry for the construction site of tomorrow. In addition, visitors can experience first-hand how the topic of sustainability is promoted at PERI with many practical examples.
    29
     
    9月
    ONE by CA Immo, Frankfurt am Main, Germany - Project-specific PERI solution for new Frankfurt skyscraper

    プレスリリース

    Project-specific PERI solution for new Frankfurt skyscraper

    At a height of around 190 m, the new 49-storey office and hotel tower ONE by CA Immo is an integral part of the skyline of Frankfurt’s metropolis on the River Main. The skyscraper attracts attention in particular due to its triangular cantilever on the 33rd floor, which is visually reminiscent of the number “1” and lends the building its name.
    10
     
    8月
    The 85 m high and 485 m long Filstal Bridge brings together all the challenges of bridge construction: a sophisticated construction method with slender superstructures and high bridge piers that widen in a Y-shape at the crown, high architectural concrete requirements and a narrow time window to meet the completion deadline.
    The cantilevered parapets on the west bridge were constructed in 24-m-sections using a total of four VARIOKIT Cantilevered Parapet Carriages.
    PERI engineers assisted with the construction of the piers, superstructure and tunnel portals using their solution expertise and modular, coordinated formwork and scaffolding systems.

    プレスリリース

    Building bridges with solution expertise and modular systems

    Customer-oriented planning and services combined with coordinated modular systems form the basis for developing formwork and scaffolding solutions that are suitable for almost any site requirements, including complex infrastructure projects. Experienced PERI engineers assisted with the construction of the Filstal Bridge, bringing their extensive solution expertise to bear.
    21
     
    7月
    Robotic automated production of reinforcement cages in Zurich.
(Photo: MESH AG)
    Filling the reinforcement cages with a Sika unique concrete formulation.
(Photo: PERI SE)
    Demonstrator object near PERI Headquarter in Weissenhorn, Germany. Shows the finished highly complex reinforced concrete structure produced with reinforcement cages without formwork.
(Photo: MESH AG)

    プレスリリース

    New technology for demanding concrete structures

    Weissenhorn/Zurich, 21.07.2022. PERI SE and Sika AG are taking a stake in the Swiss startup Mesh AG. Mesh AG has developed the world's first robot-assisted technology for the efficient and cost-effective production of complex reinforced concrete structures without formwork.
    29
     
    6月
    In Incheon, South Korea, just a few kilometers from Seoul, two new luxury residential towers were built using the RCS MAX Rail Climbing System.
    The two buildings each comprise 40 stories and are 143 m high. They provide space for a total of 351 residential units.
    With the help of the RCS MAX Hydraulic Unit, malfunctions were quickly and easily detected via light signals on the hydraulic unit as well as the indication on the display.

    プレスリリース

    Synchronous climbing of all platforms: First use of the RCS MAX in South Korea

    Only a few kilometres away from the South Korean capital Seoul, two new 140 m high luxury residential towers were built under strict safety requirements and within a tight construction time. PERI met the demand for efficient construction as well as low personnel costs with the new and innovative RCS MAX Rail Climbing System. A premiere, because RCS MAX was used here for the first time on South Korean soil.
    28
     
    6月
    PERI patented the guardrail in advance as early as 1996; the principle of integrated safety is still an essential component of the PERI UP Scaffolding Kit today. This is also shown, for example, by the integrated lift lock of the decks without additional components.
    Visitors to the PERI exhibition hall can look forward to realistic exhibits – including a segment of the PERI UP weather protection roof.
    Working platforms and access solutions from the combination of PERI UP and VARIOKIT can easily be integrated into existing structures and various PERI systems. The scaffolding manufacturer will be demonstrating how this works at bauma.

    プレスリリース

    PERI shows the future of scaffolding at bauma

    From 24 to 30 October 2022, the PERI exhibition hall at the northern open-air site (booth FN 719) in Munich will have the motto “Shaping the Future”. In addition to impressive exhibits, live demonstrations, personal discussions and information events, the scaffolding and formwork manufacturer will have many more surprises in store for visitors. Among other things, PERI will be showing completely new innovations for scaffolding as well as further developments of the digital planning tools.
    28
     
    6月
    The RCS MAX Hydraulic Unit as well as the RCS MAX Drive Rails can be easily combined with existing RCS material to optimise the performance of the system.
    Complete monitoring of the climbing process is possible by light signals on the RCS MAX Hydraulic Unit and by the display.
    Whether in building construction, dam, pier head or tunnel construction – with the pre-assembled platforms, the SCS Climbing System is quickly ready for use in a wide range of applications. The particularly high load-bearing capacity ensures rapid construction progress with few climbing sections.

    プレスリリース

    PERI at bauma: Innovative solutions for civil engineering

    From 24 to 30 October 2022, the PERI exhibition hall at the northern open-air site (booth FN 719) in Munich will have the motto “Shaping the Future”. In addition to impressive exhibits, live demonstrations, personal discussions and information events, the formwork and scaffolding manufacturer will have many more surprises in store for visitors. Among other things, PERI will be showing innovations from the climbing formwork sector as well as further developments for civil engineering.
    28
     
    6月
    With a wide range of digital services and products, PERI supports its customers on the way to the digital future of construction and will be presenting numerous solutions at bauma 2022 that provide support during various project phases.
    With PERI InSite Construction (ISC), PERI is presenting a sensor portfolio that optimally supplements common formwork systems. The sensor technology comes into play exactly where highly qualified workers and many years of concreting experience are in short supply. It provides support in making informed decisions about the concreting process.
    Visitors to the trade show can try out PERI’s software and tools and digitally experience project examples in an exchange with experts. In this way, interested parties will have the opportunity to immerse themselves in extended reality directly on site or get to know the extended planning possibilities of the various apps.

    プレスリリース

    PERI shows innovative solutions for the construction site of tomorrow at bauma

    From 24 to 30 October 2022, the PERI exhibition hall at the northern open-air site (booth FN 719) in Munich will have the motto “Shaping the Future”. In addition to impressive exhibits, live demonstrations, personal discussions and information events, PERI will have numerous other surprises in store. This will allow visitors to experience the comprehensive digital service and product portfolio as well as disruptive technologies at first hand.
    28
     
    6月
    With PERI InSite Construction (ISC), PERI is presenting a sensor portfolio that optimally supplements common formwork systems. The sensor technology comes into play exactly where highly qualified workers and many years of concreting experience are in short supply. It provides support in making informed decisions about the concreting process.
    Visitors to the PERI exhibition hall can look forward to an innovative further development project from the wall formwork sector which will make the erection of walls even more economical, faster and safer in the future. PERI is also presenting new additions to the proven MAXIMO Panel Formwork.
    The SKYMAX construction kit principle with panels made of aluminium and polymer achieves a very high level of technical and economic flexibility. The lightweight polymer panels with a particularly durable formlining represent a sustainable alternative to conventional timber solutions; their use can counteract the extreme developments on the global timber market and the corresponding long delivery times.

    プレスリリース

    PERI focuses on sustainability and future viability with innovations at bauma

    From 24 to 30 October 2022, the PERI exhibition hall at the northern open-air site (booth FN 719) in Munich will have the motto “Shaping the Future”. In addition to impressive exhibits, live demonstrations, personal discussions and information events, the formwork and scaffolding manufacturer will have many more surprises in store for visitors. For example, PERI will be showing innovative further developments in the wall formwork sector as well as sustainable and digital additions for slab formwork systems.
    18
     
    5月
    During the construction of the new faculty at the Mohammed VI Polytechnic University in Morocco, an optimally coordinated PERI formwork and scaffolding solution allowed construction to be completed within a nine-month period, while maintaining high safety standards.
    With the help of ALPHADECK Slab Formwork, it proved possible to form around 120,000 m2 of slab in just nine months.
    The low weight of the ALPHADECK panels and the possibility of early striking using the drophead system reduced the material quantities required on site and minimised the time required for work processes.

    プレスリリース

    PERI enables nine-month construction period while maintaining high safety standards

    PERI supported the construction of the new campus of the Mohammed VI Polytechnic University (UM6P) in Rabat, Morocco. With reliability and customer focus, PERI managed to meet the tight construction deadline of only nine months and helped to ensure that the project was carried out according to strict safety standards. For this construction project, PERI used a just-in-time approach to supply a comprehensive overall solution from a single source, including the new ALPHADECK and HANDSET Alpha Panel Formwork as well as PERI UP Scaffolding solutions.
    10
     
    5月

    プレスリリース

    ProSieben Sat1 Campus Unterföhring (PRESS TEMPLATE)

    When shell construction and scaffolding work go hand in hand, construction processes can be optimized and the completion process accelerated. Good cooperation is particularly important when a cramped construction site and demanding building structures make the construction work difficult. During the construction of ProSiebenSat.1's New Campus, a PERI UP scaffolding solution supports safe and rapid construction progress.
    11
     
    4月
    Refurbishment of GSH Bahnhofplatz 2
    7.5 m bridging structure with SLS Spindle fixed to steel construction platform. The connection to the eyelet on the landing platform was carefully planned with the help of a 3D planning system. The height of the landing platform and length of the RCS Rails came together with millimetre precision.
    The sandstone frescoes, which are over 100 years old, could be accessed easily for restoration purposes. Internal console brackets are fitted without the need for couplings in short, simple assembly sequences, thanks to the gravity lock ledger.

    プレスリリース

    Mega Scaffolding Kit comes into its own in the heart of Zurich

    Construction management firm Wanner + Fankhauser AG was responsible for planning and overseeing the general refurbishment of Bahnhofplatz 2 in Zurich. The building, built around 1890, was completely hollowed out with the exception of the steel beams, which were still intact.
    07
     
    3月
    PERI InSite Construction Pressure Monitoring Set wins three prizes
    The PERI InSite Construction (ISC) Pressure Monitoring Set has won the Product Innovation of the Year Award at the British Construction Industry Awards (BCIA)
    Determining the concrete pressure with PERI InSite Construction is very straightforward. The system is compatible with all formwork systems.

    プレスリリース

    Significant increase in efficiency through digital monitoring of concrete pressure

    The PERI InSite Construction (ISC) Pressure Monitoring Set for formwork systems has won the British Construction Industry Award for Product Innovation of the Year 2021 as well as being recognised in two categories at the Festival of Innovation and Technology 2021. The digital solution helps to optimise the concreting process on the construction site, thus saving time and cutting costs.
    13
     
    1月
    For the construction of the three bridges WS 49, WS 52 and WS 54, PERI supplied an optimally coordinated formwork and scaffolding solution based on the VARIOKIT Incremental Launching Facility, VARIO GT 24 and TRIO Column Formwork and the PERI UP Scaffolding System.
    For the construction of the three bridge structures with two superstructures each, a complete PERI solution with the VARIOKIT Incremental Launching Facility proved to be the key to success and was greatly appreciated due to reduced material quantities and time-saving handling.
    The flexible VARIOKIT Formwork Units could be individually adapted to suit the supporting construction and bridge geometry.

    プレスリリース

    Adherence to the weekly cycle with PERI VARIOKIT VIL Incremental Launching Facility

    The Expressway S3 in western Poland, with a total length of 480.70 km, runs in a southerly direction from the port of Świnoujście to the border between Poland and the Czech Republic. PERI provided support for the section between Legnica and Lubawka. For the construction of the three bridge structures with two superstructures each, a comprehensive PERI solution with the VARIOKIT Incremental Launching Facility proved to be the key to success and was greatly appreciated due to reduced material quantities and time-saving handling.
    26
     
    11月
    The coveted trophy for 1st place in the PERI Construction Exercise 2021 goes to RheinMain University in Wiesbaden.

    プレスリリース

    PERI’s international student competition successfully completed for the 13th time

    PERI offers all educational institutions involved in the field of construction the opportunity to participate in its well-known Construction Exercise, which not only provides valuable experience with specific practical application but also the chance to win attractive cash prizes.
    24
     
    11月
    PERI apprentices at the PERI training center, which was opened in 2019
    PERI apprentices at the PERI training center, which was opened in 2019
    PERI apprentices at the PERI training center, which was opened in 2019

    プレスリリース

    PERI is one of "Germany's best vocational trainers 2021"

    PERI AG is one of "Germany's best vocational trainers 2021". In the study conducted by the business magazine "Capital" and the talent platform "Ausbildung.de" for the 5th time, the family-owned company was able to achieve the best possible award of 5 stars in both the area of vocational training as well as in dual studies. PERI is thus one of the best vocational trainers in Germany.
    16
     
    11月
    The first successfully completed project with TwistBlock Moulds: the "Oloo's Children Centre" in the Kibera slum in Nairobi (Kenya) was built from over 7,200 bricks according to plans by Oliver von Malm. The school offers space for 400 children.
    The first successfully completed project with TwistBlock Moulds: the "Oloo's Children Centre" in the Kibera slum in Nairobi (Kenya) was built from over 7,200 bricks according to plans by Oliver von Malm. The school offers space for 400 children.
    The first successfully completed project with TwistBlock Moulds: the "Oloo's Children Centre" in the Kibera slum in Nairobi (Kenya) was built from over 7,200 bricks according to plans by Oliver von Malm. The school offers space for 400 children.

    プレスリリース

    German Innovation Award 2021 for PERI and “Start Somewhere”

    The "TwistBlock Moulds" formwork system co-developed by PERI has won the German Innovation Award 2021 in the "Building & Elements" category. The German Design Council, which this year already honored the 3D construction printing project in Beckum with a German Innovation Award, recognized "TwistBlock Moulds" as an innovation that advances the industry through its originality, implementation and effectiveness.
    02
     
    11月
    Austria’s first 3D-printed building is being constructed in Hausleiten, Lower Austria. Construction technology group STRABAG, together with PERI, the formwork and scaffolding manufacturer and a pioneer in 3D concrete printing, is realising a roughly 125 m² office building next to its asphalt mixing plant in Hausleiten.

    プレスリリース

    PERI and STRABAG print first building in Austria

    Austria’s first 3D-printed building is being constructed in Hausleiten, Lower Austria. Construction technology group STRABAG, together with PERI, the formwork and scaffolding manufacturer and a pioneer in 3D concrete printing, is realising a roughly 125 m² office building next to its asphalt mixing plant in Hausleiten. The pure printing time for the building extension is approx. 45 hours. The special dry mortar for the construction 3D printing project "Tector Print", with long workability and good pumpability, is being supplied by Lafarge.
    28
     
    10月
    Jürgen Voss will become Chief Financial Officer (CFO) of the PERI Group on 1 January 2022.

    プレスリリース

    Jürgen Voss appointed new Chief Financial Officer at PERI

    Jürgen Voss will become Chief Financial Officer (CFO) of the PERI Group on 1 January 2022. He takes over this position from Christian Schwörer, who had held it on a transitional basis since 1 May 2021 in addition to his role as Chairman of the Executive Board (CEO).
    26
     
    10月
    Within a 16-month construction period, almost 97,500 m<sup>2</sup> of formwork solutions were used – including customised PERI special formwork elements.
(Photo: Thilo Ross)
    The results of using the highest quality architectural concrete class SB 4 and the finest white concrete are visible in the many architectural highlights: Spectacularly twisted tree-like supports, creatively patterned facade prefabricated concrete elements and sharp-edged beams in a radial pattern.
(Photo: Thilo Ross)
    The three groups of tree-like supports tower over three storeys in the foyer. PERI developed a highly complex 3D special formwork made of steel elements with an overall height of 150 mm, which consisted of 63 individually designed and CNC laser-cut individual parts.
(Photo: Thilo Ross)

    プレスリリース

    PERI assists with the construction of the new headquarters of HeidelbergCement

    Highest architectural concrete quality and extraordinary architecture: The new group headquarters of the building materials manufacturer HeidelbergCement is stunning with its bright, light-flooded rooms and the radial elements made of white concrete. Within a 16-month construction period, almost 97,500 m2 of formwork solutions were used – including customised PERI special formwork elements.
    07
     
    9月
    The ISC Temperature Sensor Cables continuously measure the temperature of the concrete. The ISC Temperature Sensor Cables are very easy to install: They are installed in the reinforcement prior to the concreting process.
    To transmit measured values, the sensors are then connected to an ISC Temperature Sensor Node.
    The ISC Temperature Nodes can be affixed almost anywhere, for example to the formwork or a guardrail.

    プレスリリース

    Optimised concreting processes by measuring the concrete temperature and maturity with PERI sensors

    With PERI InSite Construction, PERI is bringing various digital solutions to market that optimise the concreting process on the construction site and help to save time and cut costs. The key: a measuring device, a cloud and the sensors themselves. These include the PERI InSite Construction Temperature Monitoring and Concrete Maturity Kit for efficient measurement of the temperature and determination of the maturity of the concrete.
    06
     
    8月
    The 160 m long tunnel was cast monolithically in a total of nine sections – with only one VTC Tunnel Formwork Carriage.
    With a customised VTC Tunnel Formwork Carriage, consisting of standard components from the VARIOKIT Engineering Construction Kit in combination with GT 24 Girders and Battens in different lengths, the project requirements could be met.
    In total, the tunnel was cast in nine concreting sections, each 17 m long and 8 m high. The combination of concreting sequence and the high speed of the VTC System helped to save a full ten days per cycle.

    プレスリリース

    VARIOKIT VTC Tunnel Formwork Carriage supports construction of Werrington Grade Separation tunnel

    For the construction of the Werrington Grade Separation tunnel, the VARIOKIT VTC Tunnel Formwork Carriage and other PERI standard components were used for a solution which, despite its rectangular structure, delivered a curved result. Optimally coordinated formwork and scaffolding solutions from a single source, as well as clever advance planning services, ensured that the project ran smoothly.
    28
     
    7月
    An exterior view of the 3D printed house in Beckum.
    An interior view of the 3D printed house in Beckum.
    A cake at the opening. f.l.t.r. Architect Waldemar Korte (Mense - Korte Ingenieure + Architekten), Dr. Fabian Meyer-Broetz (Head of 3D Construction Printing, PERI AG), Dr. Jennifer Scheydt (Head of Engineering & Innovation, HeidelbergCement AG), Minister Ina Scharrenbach, Michael Gerdhenrich (Mayor of Beckum), Henning Rehbaum (2nd row hidden, MdL NRW).

    プレスリリース

    Germany´s first printed house officially openend

    Germany's first printed house is ready for occupancy. Today, the single-family house printed by PERI using a COBOD BOD2 printer was officially opened in Beckum, North Rhine-Westphalia, by Ina Scharrenbach, Minister for Home, Municipal Affairs, Construction and Equality of the State of North Rhine-Westphalia. The state of North Rhine-Westphalia subsidized the project as part of its "Innovative Building" funding program.
    25
     
    5月
    State-of-the-art, BIM-based scaffold planning and innovative PERI systems were instrumental in the construction of the new vitamin A complex at BASF SE in Ludwigshafen, Germany.
    At peak times, up to 1,300 t of PERI system material were in use on a daily basis.
    The 30-m-high heavy-duty platforms and a bridging construction on the northern side of the building proved to be challenging aspects of the PERI scaffolding solution.

    プレスリリース

    A modern approach to planning and work operations in industrial scaffolding construction

    In the industrial environment more than anywhere else, process and operational reliability requirements are particularly stringent. At BASF SE in Ludwigshafen, Germany, PERI has demonstrated that safety and cost-effectiveness can be combined with ease by making use of state-of-the-art, BIM-based scaffold planning and innovative systems.
    13
     
    4月
    Numerous PERI systems were used during the construction of what is currently the deepest diving pool in the world with a depth of up to 45.50 metres. (Photo: Irena Stangierska)
    Deepspot is divided into two areas, the main section with a depth of 15.50 m and an additional diving tube with a total depth of 40.50 m, which connects to the main area at one edge of the pool.
(Photo: Irena Stangierska)
    ST 100 Stacking Towers were used to support the underwater viewing bridge. For reasons of statics, these could only be dismantled when the diving pool was already filled with water. Professional divers were deployed.
(Photo: Irena Stangierska)

    プレスリリース

    Diving in Poland: PERI constructs the deepest diving pool in the world

    Far away from the world's well-known diving paradises, the Polish city of Mszczonów has become home to what is currently the deepest diving pool in the world. Numerous PERI systems were used for the construction of the pool, which has a depth of up to 45.50 metres. The special highlight was the dismantling of the ST 100 Stacking Towers used: for reasons relating to the static requirements, the stacking towers could only be dismantled after the pool had been filled with water – not by the company's own construction site staff, but by specially trained divers.
    08
     
    3月
    Frank Ilg (left, Head of Future Products & Technology) and Thomas Imbacher (Managing Director Innovation & Marketing) are happy about the award together with the whole PERI team.

    プレスリリース

    PERI is one of Germany's Top 100 Innovators

    PERI, one of the world's leading manufacturers of formwork and scaffolding systems, was awarded “Top Innovator 2021” in the context of the Germany-wide TOP 100 innovation competition.
    24
     
    2月
    Čortanovci Viaduct, Novi Sad, Serbia: The two-lane superstructure in section C was realised in only five cycles using MULTIFLEX Girder Slab Formwork.
    Čortanovci Viaduct, Novi Sad, Serbia: PERI UP supported the MULTIFLEX Girder Slab Formwork with a support height of up to 20.00 m.
    Čortanovci Viaduct, Novi Sad, Serbia: In section B, the ALPHAKIT Shoring Construction Kit was chosen specifically because it is designed for a support height of up to 30.00 m.

    プレスリリース

    Clear the way for the new Čortanovci Viaduct on the Budapest-Belgrade high-speed line

    The Budapest-Belgrade line is part, and the first stage, of the planned international railway connection Budapest-Belgrade-Skopje-Athens and is currently one of the largest investment and infrastructure construction sites in the eastern part of Europe. PERI supported the construction of the Čortanovci Viaduct on the Serbian section between Stara Pazova and Novi Sad - and in addition to intensive on-site support, also provided cleverly combinable system solutions based on the modular principle.
    24
     
    2月
    Christian Schwörer, current Chairman of the Advisory Board of the PERI Group, will be appointed CEO of PERI Group for a transitional period of initially 12-18 months.

    プレスリリース

    Christian Schwörer takes over as Chairman of the Management Board of PERI GmbH

    Christian Schwörer, current Chairman of the Advisory Board of the PERI Group, will be appointed CEO of PERI Group for a transitional period of initially 12-18 months.
    12
     
    1月
    Dr. Fabian Kracht, Managing Director Finance & Organisation and Spokesman of the Group Management of PERI GmbH, has decided to leave the company

    プレスリリース

    Personnel Change in the Group Management of PERI GmbH

    Dr. Fabian Kracht, Managing Director Finance & Organisation and Spokesman of the Group Management of PERI GmbH, has decided to leave the company by 30 June 2021 at the latest and start his own business.
    08
     
    1月
    City Palace Humboldt Forum, Berlin: PERI supplied economical formwork and scaffolding solutions from a single source for the reconstruction of the Berlin City Palace. In addition to fast shuttering and repositioning times, the on-site project support provided by the PERI engineers ensured that the very tight construction schedule could be adhered to.
    City Palace Humboldt Forum, Berlin: Due to the PERI solution with external CB Climbing Platforms, no facade scaffolding was required for the shell construction. For the round reinforced concrete walls of the dome, RUNDFLEX Circular Wall Formwork was used together with FB 180 Folding Platforms.
    City Palace Humboldt Forum, Berlin: The planning and supply of formwork and scaffolding from one source created a synergistic effect for the site management team.

    プレスリリース

    Concrete and baroque: formwork and scaffolding for Berlin's Humboldt Forum

    With the Humboldt Forum, a centre of art, culture, science and education opened in the historic centre of Berlin in December 2020. PERI supplied a large quantity of economical formwork and scaffolding solutions from a single source for the reconstruction of the Berlin City Palace. In addition to this well thought-out overall solution, the project support provided by PERI engineers during construction ensured that all requirements were met and the construction schedule was adhered to.
    15
     
    12月
    Pasteurs Tower, Copenhagen, Denmark: In the heart of Copenhagen, Pasteurs Tower, a 120-metre apartment building is being built, which will be the highest apartment building in Copenhagen when it is completed in 2022.
    Pasteurs Tower, Copenhagen, Denmark: The lowering head of the SKYMAX Large Panel Slab Formwork in combination with the MULTIPROP Aluminium Slab Props allowed fast formwork insertion and removal and resulted in the 6-day cycle being maintained.
    Pasteurs Tower, Copenhagen, Denmark: The RCS Rail Climbing System helped to minimise crane operating times and was also the comprehensive solution from PERI.

    プレスリリース

    Première of SKYMAX Large Panel Slab Formwork at the construction of Pasteurs Tower in Copenhagen

    In Carlsberg City, a district in the heart of Copenhagen, a completely new neighbourhood is being built. Several high-rise buildings are currently under construction there, and Pasteurs Tower will be the highest residential building in Copenhagen upon completion. Flats will be built on 33 of the 37 floors, and commercial enterprises will be located on four floors. PERI supported the project with a variety of formwork solutions. The special highlight: The first use of SKYMAX Large Panel Slab Formwork.
    17
     
    11月
    PERI 3D Construction Printing: BOD2 construction printer assembled
    PERI 3D Construction Printing: 3D construction printing process and -results

    プレスリリース

    PERI builds the first 3D-printed apartment building in Germany

    PERI GmbH has set about printing another residential building using a 3D construction printer, this time in Wallenhausen, Bavaria. At the end of September 2020, the family-owned company announced that work had begun on Germany’s first printed residential house in Beckum, North Rhine-Westphalia. Only two months later, work has begun on the next residential building to make use of 3D construction printing technology. Upon completion, the 5-in-a-block apartment building with around 380 square metres of living space will be the largest printed residential building in Europe. On this project, the printing process is expected to take six weeks.
    02
     
    11月
    The Kennedy Center is the largest arts centre in the American capital. The extension project “The REACH” has seen the construction of three additional buildings at the centre.
(Photo: Cowles Graphic Design)
    The three pavilions were built with architectural concrete of the highest quality.
(Photo: Cowles Graphic Design)
    The extension consists of the Welcome Pavilion, the River Pavilion, and the Skylight Pavilion.
(Photo: Cowles Graphic Design)

    プレスリリース

    PERI Architectural Concrete Project “The REACH” wins ACI Overall Excellence Award

    The building extension at the imposing Kennedy Center for the Performing Arts is commonly known as “The REACH”. It comprises three interconnected pavilions that stand out due to their exceptional architectural design and architectural concrete of the highest quality. The larger-than-life project won the American Concrete Institute’s Overall Excellence Award in October 2020 and is thus recognised as a project that unites particularly creative techniques with innovative technologies. For this special construction project, PERI developed a formwork concept that combined tried-and-tested standard systems with project-specific solutions. 
    29
     
    9月
    PERI prints first residential building in Germany with portal printer BOD2 in Beckum (North Rhine-Westphalia)
    PERI 3D-construction printing process

    プレスリリース

    PERI builds the first 3D-printed residential building in Germany

    PERI GmbH is building Germany’s first 3D-printed residential building in Beckum, North Rhine-Westphalia. The two-storey detached house with approx. 80 sqm of living space per floor is not being constructed in the conventional manner, it is being printed by a 3D construction printer.
    09
     
    9月
    TrIIIple, Vienna, Austria: Thanks to a competent support service and well-thought-out system utilisation, PERI is successfully constructing the complex building geometry, which is subject to stringent requirements.
    TrIIIple, Vienna, Austria: The building is depicted using BIM 360° Field even before construction begins.
    TrIIIple, Vienna, Austria: The VST Heavy-Duty Shoring Towers are secured to the building by retaining structures. The surface-mounted distribution platform serves to accommodate the PERI UP scaffolding.

    プレスリリース

    Project-specific solutions using unique combination of formwork and scaffold systems

    Thanks to a competent support service and well-thought-out system utilisation, PERI is successfully constructing the complex building geometry of the three TrIIIPle residential towers on the Danube Canal in Vienna, which is subject to stringent requirements. Safe working processes, optimised construction site logistics and cost-effective solutions see demanding building schedule adhered to.
    04
     
    8月
    PERI has worked intensively together with the specialists from COBOD on the further development of the technology and the opening up of new markets.
    The company Röser GmbH will use the printer at the new company location in Laupheim to print a wide variety of precast concrete parts.

    プレスリリース

    PERI sells first 3D construction printer

    Röser GmbH opts for 3D construction printer from PERI Successful conclusion to resolute development work of the past few years Printing technology shows huge potential for a wide range of construction applications  
    03
     
    8月
    Air traffic control tower, Buenos Aires-Ezeiza Airport, Buenos Aires, Argentina: The new air traffic control tower at Buenos Aires-Ezeiza Airport reaches a height of 108.40 m and provides a 360° field of vision over the entire airport complex.
    Air traffic control tower, Buenos Aires-Ezeiza Airport, Buenos Aires, Argentina: The air traffic control centre starts at a height of around 62 m and consists of five self-supporting platforms.
    Air traffic control tower, Buenos Aires-Ezeiza Airport, Buenos Aires, Argentina: The customised project solution was based on two compatible PERI Modular Construction Systems: VARIOKIT combined with PERI UP.

    プレスリリース

    Keeping an eye on everything: a new control tower for Buenos Aires-Ezeiza Airport

    With a total surface area of around 7,000 m², a height of 108.40 m and a 360° field of vision over the airport complex, the new air traffic control tower at Buenos Aires-Ezeiza Airport provides the basis for optimised visual monitoring and control of air traffic. PERI assisted with the complex construction work by providing tailor-made special-purpose formwork, closely coordinated formwork and scaffolding solutions, and much more.
    01
     
    7月
    Terfener Innbrücke, Terfens, Austria: The Terfener Innbrücke, which measures roughly 235 m in length, is situated on the A12 motorway in the Inntal valley in Tyrol. (Photo: Günther Bayerl)
    Terfener Innbrücke, Terfens, Austria: The project was carried out using the balanced cantilever construction method and the VBC Balanced Cantilever Carriage. The rentable system components of the VARIOKIT Engineering Construction Kit provided the basis for this. (Photo: Günther Bayerl)
    Terfener Innbrücke, Terfens, Austria: With the VBC Balanced Cantilever Carriage, it was possible to complete 5.70-m-long concreting sections on a weekly basis. (Photo: Günther Bayerl)

    プレスリリース

    Reconstruction of the “Terfener Innbrücke” bridge on the A12 motorway in Austria’s Inntal valley

    The Terfener Innbrücke reconstruction project on the A12 motorway in the Inntal valley is one of largest bridge construction projects currently being carried out in the west of Austria. With PERI by their side, the client has been successful in implementing the project according to the demanding construction schedule since construction began in 2018. In addition to providing comprehensive planning services and on-site support during the project, PERI has also made use of the VBC Balanced Cantilever Carriage for the first time in Central Europe.
    04
     
    5月
    PERI has delivered around 480 tonnes of formwork and scaffolding material to the client’s construction site in addition to providing comprehensive on-site support.
    On account of the subterranean position up against the ground earth, it was not possible to use end-to-end formwork ties when concreting the retaining walls. For this reason, a single-sided formwork solution was required.
    The columns were formed in a straightforward manner without any special-purpose components thanks to the integrated perforated strips on the LIWA Panel Formwork.

    プレスリリース

    Bandra Kurla Complex (BKC): PERI assists with the construction of Asia’s largest underground station

    The Bandra Kurla Complex (BKC) is an underground station on the Mumbai Metro, a rapid transit system that is currently under construction. The rapid transit system in the Indian metropolis will serve the city of Mumbai itself as well as its entire metropolitan area in the federal state of Maharashtra. By supplying comprehensive formwork and scaffolding solutions, PERI has been providing assistance since construction began on the major project in April 2019 so that the BKC can be completed within the demanding construction time-scale of only 14 months.
    01
     
    4月
    The gas compressor platform CA-KU-A1 was erected at the shipyard of Dragados Offshore in Tamaulipas/Mexico with the aid of comprehensive PERI scaffolding solutions.
    CA-KU-A1 has a weight of 23,900 tonnes and can compress around 450 MMcf of sour gas per day.
    It was possible to adapt the suspended working platforms variably in 25 cm increments to account for the gaps between the steel girders. Scaffold tubes and couplings were used to fix them to the steel girders of the platform.

    プレスリリース

    New platform for the Mexican oil and gas field Ku-Maloob-Zaap

    The oil and gas field Ku-Maloob-Zaap (KMZ), which covers a total area of around 121 km², is situated in the bay of Campeche, 105 km north-east of the city of Ciudad del Carmen. In 2019, a new gas compressor platform named CA-KU-A1 was added to the oil and gas production complex that is located there. To carry out the time-critical construction project, PERI provided flexible scaffolding solutions and comprehensive on-site support. 
    02
     
    3月
    The sustainable residential complex GIOIA 22 is situated at the heart of the Porta Nuova district of Milan and, upon completion, will cover 65 percent of its annual energy requirements using renewable energy sources. (Photo: Alberto Brevi)
    A characteristic feature of the building is its folded shape. It consists of a main core and secondary core. To achieve this, the first RCS Climbing Unit was installed using vertical as well as laterally inclined climbing rails. (Photo: Alberto Brevi)
    It was possible to form both the inclined and the straight columns using the SRS&nbsp;Circular&nbsp;Column&nbsp;Formwork. Using 4,000 linear metres of PROKIT improved safety levels for the personnel on the jobsite further still. (Photo: Alberto Brevi)

    プレスリリース

    Innovative and sustainable: PERI assists with the construction of the office complex GIOIA 22, Milan

    GIOIA 22 is setting new benchmarks in terms of sustainability: the 120 m tall tower at the heart of the Porta Nuova district will cover 65 percent of its annual energy requirements using renewable energy sources. The 30 storey tall building will provide enough space for approximately 2,700 people, 350 parking spaces and 13 lifts. PERI provided support during the construction process of this inventive project using a combination of tailor-made formwork and climbing solutions.
    07
     
    2月
    The principle of the innovative SKYMAX formwork solution is based on compatible components made of various materials. The result of this is a construction kit that paves the way for flexible solutions that will fulfil specific project requirements.
    Working with the SKYMAX system is remarkably simple due to the low number of different components. The system of combining the panels and heads is self-explanatory.
    The panel slab formwork can be installed safely and efficiently from the level below. The slab panels are slipped into the head from the installation surface below and pivoted upwards.

    プレスリリース

    Groundbreaking innovation for slab formwork procedures

    The safety requirements imposed on slab-forming procedures are becoming an increasingly significant issue. At formwork and scaffolding manufacturer PERI, ensuring safety during day-to-day work is priority number 1. PERI has unveiled the future-proof large panel formwork system SKYMAX, a groundbreaking innovation for formwork systems. Not only does the innovative principle significantly increase safety levels for users, it also improves the degree of economic efficiency.
    03
     
    2月
    The Al Bustan Street South construction project is one of four parts that make up the Sabah Al Ahmad Corridor infrastructure project and features bridges with a total length of more than 10 km.
    The PERI system solution was tailored to account for the specific circumstances on site as one of the great challenges of the project was to carry out the construction work without causing major disruption to traffic.
    Combining the modular VARIOKIT and PD 8 systems proved to be the ideal approach to establishing the superstructure formwork for the in-situ concrete bridge. PD 8 shoring, which was adjusted quickly and steplessly to the different heights, ensured that loads could be transferred in an optimum manner.

    プレスリリース

    Demanding infrastructure project underway in Doha

    Adherence to deadlines, efficiency and completion without interrupting the flow of traffic are the requirements that are of paramount importance during the Sabah Al Ahmad Corridor infrastructure project. For the construction phase on Al Bustan Street South, PERI made use of the PD 8 shoring system and a combination of systems from the PERI UP Flex portfolio in addition to a tailor-made VARIOKIT solution with VST heavy-duty shoring towers. The customer has therefore taken full advantage of the opportunity to procure time-saving formwork and scaffolding systems from a single source.
    03
     
    2月
    PERI Canteen
    PERI Canteen Inside

    プレスリリース

    PERI canteen awarded third best canteen in Germany!

    The canteen at the PERI headquarter in Weissenhorn has achieved 3rd place in the Germany-wide canteen test carried out by the magazine FOCUS and Food & Health e.V.
    23
     
    1月
    With this award, companies are honoured for extraordinary success in the implementation of measures to increase efficiency in the office area.

    プレスリリース

    PERI wins Office Excellence Award 2019

    PERI GmbH has received the Office Excellence Award 2019. With this award, companies are honoured for extraordinary success in the implementation of measures to increase efficiency in the office area. In recent years, Volkswagen, Daimler, Viessmann and Schmitz Cargobull were among the winning companies.
    03
     
    1月
    The large-scale project, SKY PARK, is the new cultural epicentre of Bratislava – in addition to customised scaffolding solutions, PERI made use of the RCS rail climbing system in combination with VARIO GT 24 girder wall formwork during the erection of the residential complexes.
(Photo: Penta Real Estate)
    The complex planning and construction of the façade scaffolding for the three 105-metre-high elliptical residential towers was the product of a collaboration between PERI Slovakia and PERI Czech Republic.
(Photo: Penta Real Estate)
    On account of the high axial forces, a combination of different PERI scaffold systems proved to be the optimal solution for erecting the façade.
(Photo: Penta Real Estate)

    プレスリリース

    Scaffolding solutions for three residential towers in the new cultural epicentre of Bratislava

    The new cultural epicentre of the region is currently being built in Bratislava: SKY PARK is a multi-functional centre that combines a modern living and working experience with public spaces. Spanning approximately 5 hectares, the site currently encompasses three residential towers, two office buildings, a large park area and the Jurkovič thermal power station, which is being refurbished as part of this major project. In addition to customised PERI scaffolding solutions, amongst others the PERI RCS rail climbing system in combination with the VARIO GT 24 girder wall formwork was used during the erection of the residential complexes. 
    10
     
    12月
    Official opening of the new PERI Vocational Training Centre
    Official opening of the new PERI Vocational Training Centre

    プレスリリース

    PERI opens new vocational training centre at its Weissenhorn headquarters

    PERI today opened the company's new vocational training centre at its headquarters in Weißenhorn. In total, the family-owned company is investing a single-digit million Euro amount in the new training facility.
    06
     
    12月
    The best: Participants and supervisors of the final round of the 12th PERI Construction Exercise.
    Place 1: Felix Ott from the Munich University of Applied Sciences with his supervisor, Professor Karl-Friedrich Bisani.

    プレスリリース

    Awards for the prize winners of the 12th PERI Construction Exercise

    PERI offers all educational institutions involved in the field of construction the opportunity to participate in its well-known Construction Exercise, which not only provides valuable experience with specific practical application but also the chance to win attractive cash prizes.
    02
     
    12月
    A total of 14 different, perfectly coordinated PERI system solutions are in use at the construction site of the Calgary Cancer Centre, providing support to the construction workers on site.
    The different storey heights, ranging from around 4 to 7 m, posed a significant challenge to the planning and design team.
    Over the course of this large project, a total of more than 15,000 m² of slab formwork will be used – including the SKYDECK system for construction of the underground garage.

    プレスリリース

    Wide range of PERI system solutions used during construction of the Calgary Cancer Centre

    The building of the Calgary Cancer Centre, a state-of-the-art cancer treatment and research centre, is not only the largest construction project currently being carried out in the province of Alberta in Canada, it is also the largest construction project PERI has ever taken on with regard to the volume of material on site. The use of 14 different perfectly coordinated PERI system solutions has made it possible to realise the complex design of the centre in an efficient manner.
    04
     
    11月
    PERI UP nestles up to Ulm Minster - up to 71 m high - for the extensive renovation work. A 7 m high intermediate platform provides a possible storage location for the new stones.
    The interior was measured without any as-built plans using 3D laser scanning and this was transferred into a 3D building model – providing the basis for the scaffold planning with PERI CAD.
    The 13,000 m³ PERI UP birdcage scaffold in the choir of Ulm Minster was constructed free standing – with no anchorages onto the historic building structure.

    プレスリリース

    Three construction sites – one church: Renovation work on Ulm Minster

    The 161.53 m high main tower of Ulm Minster is known as the highest church spire in the world – equally as impressive is the 29 m long, 15 m wide and 26 m high choir. PERI systems are currently assisting with the extensive renovation work on the vaulted ceiling and the choir stalls as part of the restoration of the main tower and the north-east, 86 m high choir tower.
    21
     
    10月
    Thomas Imbacher new Managing Director “Innovation & Marketing” in PERI Group Management

    プレスリリース

    New Managing Director “Innovation & Marketing”

    Effective November 1, 2019, Thomas Imbacher, Director of the Sales Region Central Europe, will take over the position as Managing Director “Innovation & Marketing” in the Group Management of PERI GmbH.
    02
     
    10月
    Not only did the SKYDECK speed up forming operations, it also provided a particularly high level of safety on the construction site.
    From above, the building looks like a triangle. This complex shape meant that all parties involved had to work with a high degree of precision and that tailor-made solutions from PERI had to be used.
    The PERI formwork and shoring solutions were optimally coordinated in order to achieve the desired shape of the building and meet its demanding architectural requirements. Thanks to the 25 cm or 50 cm end-to-end system grid, it was possible to adapt the modular scaffold system, PERI UP Flex, to the various geometries and loads in the form of a load-bearing construction.

    プレスリリース

    Customised PERI solutions for complex, architectural requirements

    PERI has contributed to the construction of the new research and development centre of Ferring Pharmaceuticals A/S in Copenhagen by supplying individual formwork and scaffolding solutions. The building, which looks like a triangle when viewed from the air, is being erected in a central location right next to the sea at the Øresund crossing between Copenhagen and Malmö. The use of pre-assembled VARIOKIT system solutions and SKYDECK slab formwork streamlined the procedure significantly. At the same time, PERI’s systems ensured that the architectural concrete was of the highest quality.
    02
     
    9月
    With the help of a crane, large-sized TRIO elements can be moved very quickly thus ensuring valuable time-savings. In one part of the airport building, walls up to 14 m high were realised.
    For processing a slab area of approx. 220,000 m² at a height of up to 17.50 m, the construction teams installed working platforms totalling 15,500 m² and featuring spans of up to 15 m whilst being supported by PERI UP Flex shoring.
    Istanbul Airport can accommodate 90 million passengers annually. A total of 13 different building contractors contributed to the completion using PERI systems. (Photo: İGA Havalimanları İnşaatı Adi Ortaklığı Ticari İşletmesi)

    プレスリリース

    PERI systems in use for construction of a new airport in Istanbul

    Istanbul Airport can accommodate around 90 million passengers per year but can easily be expanded in order to handle up to 200 million passengers annually. Two gigantic terminal buildings have been planned to deal with this enormous increase in passenger volume - the first terminal alone provides 1.44 million m² of effective area. Various PERI systems were used in the construction of the terminal building as well as for realising other structures.
    01
     
    8月
    The new Puente Pumarejo in Latin American has a length of 2.3 km. The complex-shaped pylons rise up to a height of 80 m.
    Perfectly matched to suit the formwork solution, PERI UP Flex Shoring Towers and ST 100 Stacking Towers formed high load-bearing supporting constructions with heights between 5 m and 22 m in the bridge edge areas. PERI UP also served to provide stair access in order to safely reach the higher working levels.
    CB 240 Climbing Platforms, together with TRIO Wall Formwork, formed safe and accurate crane-climbed units for forming the pylons. In the area of the pier heads, VARIOKIT Truss Girders served as a reliable supporting construction for the working platform.

    プレスリリース

    Record-breaking bridge successfully completed with PERI systems

    The new cable-stayed bridge over the Rio Magdalena is 2.3 km long. PERI engineers supported the challenging construction project by providing a customised formwork and scaffolding solution that has been designed for realising the simultaneous construction of the pylons, bridge piers along with the superstructure. The versatility of the formwork and scaffolding systems as well as the combination possibility with the VARIOKIT Engineering Construction Kit facilitated shortened assembly times also when dealing with complex geometries.
    10
     
    7月
    On the picture (from left): Stefan Friedrich (association "Die Familienunternehmer"), Alexander Schwoerer and Monika Eckert (moderator of the evening).

    プレスリリース

    Innovation Award for PERI

    The association "Die Familienunternehmer" has awarded the Bavarian Family Entrepreneur Prize for the eighth time. With this award, the association honors the commitment of family businesses to their respective regions. In 2019, PERI received the award as Bavarian family enterprise of the year in the category innovation.
    01
     
    7月
    Triangular recesses were taken into consideration for the thin reinforced concrete slab. With different heights of up to 11 m, these feature up to 120 circular openings with a diameter of 20 cm respectively. These form a fine net which allows the natural sunlight through the subsequently integrated glass blocks in the interior of the tennis centre.
    For constructing the complex, curved reinforced concrete walls with differently sized box-outs along with varying wall thicknesses, customised 3D special formwork elements were used.
    CNC-cut panels were prefabricated to suit the planned number of uses and assembled on site in accordance with the PERI assembly plans.

    プレスリリース

    Extraordinary architectural project combines tradition and modernity

    As part of the Kuwait University's Student Activities and Athletic Facilities Project (SAAF) in Al-Shadadiya, an indoor tennis centre is currently being realised. The training centre will provide athletes and students with an area of 7,100 square metres in order to carry out their daily training activities. In addition, the building also has three floors and space for around 2,000 spectators. Externally, the sports venue impresses with its dome-shaped roof in the style of traditional Islamic architecture. PERI planned and delivered a project-specific solution for facilitating the efficient execution of the architecturally sophisticated dome-shaped building.
    11
     
    6月
    Changes in the Management of the PERI Group

    プレスリリース

    PERI gears up for the future

    PERI Group Management expanded by a fourth department for Innovation & Marketing - Alexander Schwoerer to change from Group Management as another representative of the shareholder family into an active Advisory Board function - Carl Heathcote becomes Managing Director for Sales & Engineering
    03
     
    6月
    Covering the size of 24 football pitches, 17 m high and storage capacity for 13.2 million barrels of oil: at South Africa's Saldanha Bay, a huge crude oil storage facility with twelve 110 m x 110 m tanks was realised.
    Instead of a conventional slab formwork solution, the engineers designed a construction variant borrowed from bridge building using formwork carriages. Thereby, the table-like slab formwork was supported by a VARIOKIT framework construction.
    The high load-bearing capacity of the VARIOKIT system provided the required support for the concrete slab until it had hardened. With only 7 formwork carriage units per tank, each casting segment crane-independently realised 880 m² of slab area per storage tank in regular 5-day cycles.

    プレスリリース

    Unconventional VARIOKIT solution for underground tanks

    Covering the size of 24 football pitches, 17 m high and having sufficient capacity to store a total of 13.2 million barrels of oil: in Saldanha Bay, South Africa, a huge crude oil tank farm featuring twelve 110 m x 110 m tanks has been realised. The clients of WBHO Construction Ltd. integrated the team of PERI engineers into the project at a very early stage so that they could work together to develop the most appropriate solution for the gigantic task ahead already during the planning phase. The most cost-effective method for constructing the underground tanks proved to be a project-specific solution using the VARIOKIT steel composite carriage with additional specially designed structural steel members.
    02
     
    5月
    The project-specific solution for realising the inner lining was based on a moveable supporting structure consisting of system components taken from the VARIOKIT Engineering Construction Kit.
    The oval-shaped underground structure measures 15 metres in diameter and is up to 30 metres below the city centre of San Francisco.
    The high load-bearing capacity of the VARIOKIT system components facilitated the safe transfer of large loads while simultaneously allowing flexible adaptation to accommodate the challenging tunnel cross-section.

    プレスリリース

    VARIOKIT tunnel formwork solution deep in the heart of the Golden City

    With construction work being carried out in depths up to 30 metres in the centre of the city famous for the Golden Gate Bridge, an enormous building structure is being realised. When completed, the Chinatown Subway Station will form the northern end of San Francisco's Central Subway System. The new station will significantly improve access to public transport in some of the city's most densely populated areas. The architectural requirements presented the contractor with enormous challenges. PERI developed a project-specific solution based on the VARIOKIT Engineering Construction Kit in order to economically construct the inner lining.
    12
     
    4月
    Added value along the entire value chain – in this respect, PERI presented among other things new digital solutions. One highlight: the DUO Planner, an app for easy planning of the lightweight universal formwork.
(Photo: PERI GmbH)
    New system components have been created for the PERI UP modular system – consisting of PERI UP Easy Facade Scaffolding and PERI UP Flex modular scaffolding. At PERI, for scaffolding technology this also applies: the widest possible range of applications with the lowest possible number of components
(Photo: PERI GmbH)
    The principle of the innovative SKYMAX formwork solution is based on compatible components made of different materials. This creates a type of modular system that facilites flexible solutions depending on project requirements. The panel slab formwork can be completely assembled from the level below while the components can also be used for assembling slab tables.
(Graphic: PERI GmbH)

    プレスリリース

    New products at the leading global trade fair bauma

    Weissenhorn / Munich. Under the motto "Hand-in-Hand for Your Success", PERI presented a range of innovative new products for formwork and scaffolding technology at the bauma which took place from 8th - 14th April. Individual customer requirements of various target groups were the main focus of the respective product development. In keeping with its motto, PERI also presented its extensive range of services and software some of which could be tested directly on the stand.
    20
     
    3月
    Architects, planners, work planners and civil engineers can now download more than 200 scaffolding components in over 150 CAD formats at no cost.

    プレスリリース

    PERI relies on CADENAS for BIM CAD scaffolding component library

    Architects, planners, work planners and civil engineers can now download more than 200 scaffolding components in over 150 CAD formats at no cost.
    01
     
    3月
    PERI UP Easy was awarded the BUDMA Trade Fair Gold Medal. The award was accepted by Łukasz Majkowski, Branch Manager PERI Poland (third from left).
    The Gold Medal of the BUDMA Trade Fair is awarded for modern and innovative products that set trends for the future of the construction industry.
    In addition to the PERI UP Easy Facade Scaffolding, PERI also exhibited the DUO System Formwork, the universal lightweight formwork for walls, foundations, columns and slabs.

    プレスリリース

    PERI Poland honoured – double success for PERI in Poland

    The international BUDMA Construction and Architecture Fair is one of the most famous trade fairs in Poland and focuses on construction industry developments from around the world. Every year, after a thorough and rigorous evaluation by a team of experts, the coverted gold medal – one of the best-known awards on the Polish market – is presented to innovative products of the highest quality.
    01
     
    3月
    On the first section through the mountainous region of western Northern Macedonia, the new motorway crosses a total of 14 viaducts. On a length of approx. 10 km, around 4,000,000 m³ of earth had to be excavated and a total of 150,000 t of concrete and 15,000 t of reinforcement were subsequently processed.
    The left, right and centre sections of the bridge superstructure were sub-divided into 64 concreting sections and simultaneously realised using a total of four VBC Balanced Cantilever Carriages.
    With the balanced cantilever method, the superstructure is symmetrically realised on both sides in the form of a balance beam - starting from the rigidly connected pier.

    プレスリリース

    Project-specific solution for the longest cantilever bridge in Northern Macedonia

    Upon completion, a new, almost 65 km long motorway will connect the cities of Kičevo and Ohrid in the south west of the North Macedonian Republic. On the first section between Kičevo and Podvis, it was necessary to build a 381 m long viaduct. For this, PERI engineers developed a project-specific solution on the basis of the VARIOKIT balanced cantilever equipment. As a result, this allowed the construction team to maintain the very tight building schedule – in spite of the challenging terrain.
    11
     
    2月
    Thanks to the project-specific solution using mainly system components, the contractor was provided with a cost-effective and efficient solution.
    With the help of specially assembled framework-type tables comprised of parts from the VARIOKIT Engineering Construction Kit, it was always possible to realise the range of balcony cantilevers as well as accommodating the high loads from the parapet prefabricated elements in the same system.
    The main difficulties in this project lay in finding a formwork and scaffolding solution for the funnel-shaped cantilever on the 5th floor and the differently arranged cantilevered balconies which projected outwards up to 4 m.
(Rendering: Raumgleiter)

    プレスリリース

    Green residential tower grows with VARIOKIT

    The Aglaya high-rise building is situated in the so-called Suurstoffi area in Risch Rotkreuz next to Lake Zug. In a unique way, it combines the increasing desire of living in a green environment with careful management of building land resources. PERI planned and delivered a scaffolding and formwork solution to meet the difficult formwork challenges of this flagship project for realising a future-oriented living environment.
    01
     
    2月
    The mobile SKY Anchor attachment point facilitates safe shuttering operations from above whilst using PPE.
    With MAXIMO, PERI set a new standard in the industry a few years ago with the single-sided tie technology.
    PERI provides comprehensive support for its customers through all project phases with products, systems and services.

    プレスリリース

    PERI at bauma 2019

    Weissenhorn / Munich. At the industry´s leading international trade show from 8th to 14th April 2019 in Munich, PERI will be showcasing numerous new developments for formwork and scaffolding technology to customers and visitors alike. The focus is on innovations, practice-oriented system supplements as well as further developments which cover a wide range of applications and target groups. An important feature of the company´s trade fair appearance is that of digital solutions along with the comprehensive range of services that PERI uses to make project realisation regarding all aspects of formwork and scaffolding more economical and safer for all users.
    16
     
    1月
    PERI DUO won the BAKA Award for Product Innovations 2019. The award was presented on the opening day of BAU 2019 in Munich by Gunther Adler, state secretary at the Federal Ministry of the Interior responsible for construction and homeland affairs. Bernhard Überle and Helmut Sterflinger of PERI Germany accepted the special award on behalf of the company.
    Already at the first day of the fair trade BAU 2019 in Munich PERI recorded a lot of visitors. Next to the awarded composite formwork DUO the expert audience was interested in the MAXIMO panel formwork, the PERI UP Easy facade scaffold as well as in many other innovations in hall A2 (booth 115).
    PERI DUO is manufactured using a zero-waste manufacturing process that results in no waste being produced. All of the raw materials are integrated in the production process. In line with this closed cyclic economy, the DUO material remains as a material after recycling and can be used for new products such as formliners.

    プレスリリース

    PERI DUO wins BAKA Prize for Product Innovation 2019

    Weissenhorn-based formwork and scaffolding manufacturer, PERI, has won the BAKA Product Innovation Award 2019. Gunther Adler, State Secretary at the Federal Ministry of the Interior responsible for construction and homeland affairs – together with Dr. Ing. Reinhard Pfeiffer from Messe München and BAKA Chairman Ulrich Zink – presented the award in front of around 800 invited guests at the BAU 2019 in Munich on 14th January. The special award was accepted on behalf of the company by Bernhard Überle, PERI Sales Director Germany, and PERI Sales Manager, Helmut Sterflinger.
    12
     
    12月
    PERI symposium for professors

    プレスリリース

    Construction Symposium: PERI brings universities up-to-date on latest developments

    On 27th and 28th November 2018, formwork and scaffolding manufacturer PERI held its traditional symposium for professors – this was the ninth time the event had been organised. More than 30 lecturers from construction faculties of German and Austrian universities took advantage of the opportunity to obtain detailed and practical information about the current state of formwork and scaffolding technology at the advanced training centre in Weissenhorn. The main focus was on process optimisation on construction sites as well as BIM and open innovation.
    10
     
    12月
    The new component libraries have significantly expanded the existing cooperation between Trimble Software Tekla and PERI GmbH, which has been in place since 2016. In keeping with providing the best possible solution for customers, Tekla users can also integrate PERI systems into their solution while using their usual software.
    All components contained in the data package feature the appropriate metadata and allow BIM-related re-use in the construction process. This provides PERI customers with the necessary transparency in order that their components are used in the most effective way possible.

    プレスリリース

    Best digital service for customers

    The digital world of today means changes on a daily basis. Under the motto “The best possible solution for our customers”, the Weissenhorn-based company has now made the most important PERI wall, slab and column shuttering systems available in the Tekla Warehouse. As a result, this has significantly expanded the cooperation that has existed since 2016 and will allow planners in particular to benefit in future from the advantages of Building Information Modelling without sacrificing the convenience of their familiar software environment.
    07
     
    12月
    At BASF's largest current investment project, an innovative scaffolding concept based on the PERI UP Flex scaffolding system has been saving both time and money - and has also set high standards regarding work safety.
    BASF, promaintain and PERI rely on forward-looking planning, coordination and implementation procedures for constructing the new acetylene plant.
    3D planning based on the BASF plant model facilitates scaffolding solutions and adjustments while, taking into account all plant components, which are to be assembled.

    プレスリリース

    Innovative BIM scaffolding concept in industrial construction

    At BASF SE in Ludwigshafen, a new state‑of‑the-art acetylene plant is currently being built. The basis for the construction of the facility is an innovative, BIM‑based scaffolding concept as well as the PERI UP scaffold system with its high level of flexibility for ensuring consistently safe work operations.
    04
     
    12月
    PERI apprentices

    プレスリリース

    Excellent: PERI one of the best “Vocational Trainers in Germany"

    The family business PERI is among the best vocational training companies in Germany. In a Germany-wide study by the business magazine "Capital", both the vocational training as well as the dual studies at PERI received the highest possible marks.
    09
     
    11月
    Normally, DUO would be used to form smaller regular shaped structures as an efficient alternative to heavier systems. However, this project proved that the DUO system is capable of more.
(Photo: seanpollock.com)
    From the onset, the idea was to use DUO panels for horizontal and vertical applications to form slabs, columns and walls. The lightweight panels, the largest weighing no more than 25 kg, were ideal for the project due to its location and confined site space.
(Photo: seanpollock.com)
    Quite literally, the structure pushes the boundaries of a ‘simple square’, as it comprises irregular angles in addition to varying floor heights throughout.
(Photo: seanpollock.com)

    プレスリリース

    A bold concrete structure built entirely with DUO formwork

    Over the past year, a concrete structure has slowly emerged amongst a more conventional residential setting in East Sussex. The single-storey structure is the first self-build project the owner, Adrian Corrigall, has ever built. At the same time, it’s also PERI’s first housing project with DUO in the United Kingdom.
    06
     
    11月
    Safety in focus: The complete enclosure with the RCS climbing protection panels offers safe working conditions as well as weather protection for the site team.
    RCS P Fold Down units are capable of opening and closing using integrated hydraulics to give clear access to the working level for cycling table forms.
    The ACS Core 400 self-climbs to the next level, with concrete placing boom integrated on the top.

    プレスリリース

    PERI‘s ACS Core 400 and RCS climbing systems push forward with redevelopment of city landscape

    Downtown Edmonton is seeing a significant transformation with the development of the ICE District. The complete redevelopment includes premium residential, retail, public and office spaces in one location. The skyline is dramatically changing as large scale projects continue to rise, including the 66-storey Stantec Tower. PERI has been involved with the project from the beginning, working together with PCL and Newway to provide professional engineering solutions and logistical support.
    30
     
    10月
    In Copenhagen the so-called "BOD" ("Building on Demand") was printed with a 3D concrete printer from COBOD. This office building is the first 3D printed building in Europe.
    New Impulses for 3D printing in the construction industry.
    COBOD 3D printer

    プレスリリース

    PERI Group acquires stake in COBOD International A/S

    The PERI Group, one of the world's leading companies in the field of formwork and scaffolding for the construction industry, acquires a stake in the Danish 3D concrete printing specialist COBOD International A/S based in Copenhagen.
    02
     
    10月
    Changes in the Management of the PERI Group

    プレスリリース

    Changes in the Management of the PERI Group

    Due to differing views on the concept of leadership and management, Dr. Rudolf Huber, Chief Executive Officer (CEO) of the PERI Group, is stepping down from office by mutual agreement as of September 30, 2018.
    04
     
    9月
    After months of planning and construction, Kuma’s vision is now a tangible work of art that is set to open its doors to the public.
    The complex geometry of the panel face required the highest quality work from PERI fabrication teams in the UK and Germany. The panels consist of two layers of 4 mm plywood, 21 mm thick lathing timbers, Cleatbox interlocking chipboard rib grillage and VARIO base panel – SRU walers, GT 24 girder and 21 mm thick chipboard panel face.
    Fabrication in action at Rugby.

    プレスリリース

    Extraordinary formwork for an extraordinary building

    Inspired by cliffs of sedimentary rock standing proud against the sea, at the centre of Dundee’s £1 billion waterfront regeneration, lies the V&A Museum of Design. This £80.11 million masterpiece, the first UK work penned by renowned Japanese architect Kengo Kuma, is a bold creation combining complex concrete architecture with glass facades and linear concrete cladding. PERI has provided professional engineering services and bespoke formwork solutions in order to achieve the best possible architectural concrete result.
    01
     
    8月
    For the M-8 road bridge, PERI engineers planned a project-specific shoring and formwork solution. The heavy-duty scaffold construction, consisting of VRB Heavy-Duty Truss Girders and VST Heavy-Duty Towers, safely transferred the high loads via long spans into the ground.
    For forming the superstructure comprised of bridge beams and carriageway slab, the planners combined VARIOKIT formwork units with VARIO GT 24 Girder Wall Formwork system components.
    The implementation plan featured two independent bridge superstructures with a pre-stressed, twin-webbed T-beam cross-section. The two superstructures were alternately concreted whereby the formwork and shoring were placed in an offset position from one bridge segment to the other.

    プレスリリース

    Premiere for the VARIOKIT Heavy-Duty Truss Girder in Poland

    For realising a demanding bridge construction in the wetland area near Szczecinek, PERI engineers planned a project-specific shoring and formwork solution. Heavy-Duty Truss Girders and Heavy-Duty Truss Towers based on the VARIOKIT Engineering Construction Kit safely transferred the high loads via large spans and into the ground; VARIOKIT formwork units along with the customised formwork solution were supported on this. The first use of the truss girders convinced the construction team due to the low weight and fast assembly. Factors that facilitated both time and cost savings during the execution.
    02
     
    7月
    Constructing the asymmetric structure presented many challenges for the project’s concrete contractor, Baker Concrete, and formwork supplier, PERI USA.
    More than 9,000 square meters of PERI’s VARIO system wall forms were required to place the National Veterans Memorial and Museum’s curved walls.
    Because the radius of the Memorial and Museum’s curving walls changes continuously, each form panel used on the project was unique.

    プレスリリース

    Custom formwork and box-outs precisely form sweeping curves of unique concrete structure

    The National Veterans Memorial in Columbus, Ohio will open in the fall of 2018. The elegant, sweeping curves of the three interlaced cast-in-place reinforced concrete rings that define the structure belie the complexity of the project’s design and construction.
    24
     
    5月
    In 2017, PERI founded the Digital Transformation Office in order to systematically promote digitalization. With the integration of the BIM Competence Center in this area, the company is taking account of the increasing strategic importance of this topic.

    プレスリリース

    In focus: PERI bundles BIM activities

    Weißenhorn. PERI, one of the world's largest manufacturers and suppliers of formwork and scaffolding systems, has been a pacesetter on the road to the future of digital construction for many years now. In 2017, the family‑owned company founded a Digital Transformation Office whereby all of PERI's digitalization‑related strategic activities and initiatives would be grouped together and coordinated. Furthermore, the PERI BIM Competence Center, which has existed since 2015, has also been integrated into the Digital Transformation Office.
    02
     
    5月
    For constructing the 134 m high residential building, safety was a top priority. The PERI RCS P Climbing Protection Panel served as an enclosure as well as anti-fall protection. The gap-free enclosure of the skeleton structure´s floors protected the construction team also at great heights against strong winds and the weather.
    Landing platforms consisting of standard system components served as temporary storage areas and for transferring loads to the following storeys. The platforms could be variably positioned anywhere on the building.
    For cost-effective construction of the internal elevator shafts, MAXIMO external core formwork climbed with the RCS Rail Climbing System. Due to the rail-guided climbing procedure, the climbing units were reliably attached to the structure at all times which made climbing fast and safe also in windy conditions.

    プレスリリース

    Majakka reaches for the clouds – first residential tower in Finland

    The tallest residential building in Finland – the 134 m high REDI Majakka Tower – is currently under construction in the old harbour district in the eastern part of Helsinki´s city centre, in the heart of Kalasatama. With the experience and competence resulting from countless projects worldwide in the area of climbing technology, PERI engineers have been supporting the construction team in the planning and efficient implementation of Finland's largest inner-city construction site.
    10
     
    4月
    For the construction of the new terminal building in the port of Gazenica, the optimally coordinated PERI formwork and scaffolding solution facilitated fast and uninterrupted construction progress.
    Using PERI SRS Circular Column Formwork, V-shaped columns with diameters up to 100 cm could be realized. The first 6 m high concreting section was supported by SRU Steel Walers and Heavy-Duty Spindles taken from the VARIOKIT Engineering Construction Kit.
    For concreting the second section of the 10.30 m high columns, a working platform was installed using PERI UP Flex Shoring which could be flexibly adapted in the 25 cm system grid to accommodate the diagonally-positioned circular columns.

    プレスリリース

    Fast construction progress thanks to a safe and coordinated scaffolding and formwork solution

    For the construction of the new terminal building in the port of Gazenica, PERI Croatia planned and supplied a comprehensive formwork and scaffolding solution from a single source. The systems used were perfectly matched to one other and greatly contributed to ensuring safe and time-saving execution through efficient work procedures. The stringent demands in terms of occupational safety and surface quality could be met in spite of the complex building geometry and the need for large supporting heights.
    01
     
    3月
    By combining CB Climbing Units with the MAXIMO Panel Formwork, the required high quality of the concrete surfaces was achieved while, at the same time, maintaining the tight construction schedule.
    For the shafts, 90° MXSE Shaft Corners with MAXIMO elements formed a complete formwork unit which could be quickly moved with a single crane lift.
    Once struck, a clearance of 35 mm is created on each side of the shaft so that the entire internal shaft formwork can be moved to the next level.

    プレスリリース

    Fast striking and easy climbing with the MAXIMO Shaft Corner

    For realization of the Hexagon Headquarters in Calgary, reducing labour costs and execution times as well as minimizing the usage of the cranes for faster forming operations, was the main focus of attention for the construction company. By combining MAXIMO Panel Formwork with CB Climbing Units, not only could the required, high-quality concrete surfaces be achieved along with maintaining the tight schedule, but also ensured high safety and productivity levels of site personnel.
    01
     
    2月
    The new headquarters of the environmental company Bee'ah is currently being realized according to the plans of the famous architect Zaha Hadid. The design of the futuristic building with its complex structure is based on the shape of a sand dune. (Source: www.zaha-hadid.com)
    At the centre of the design concept is the 23 m long and 17 m wide dome above the entrance hall. The PERI UP Modular Scaffolding forms the supporting structure of the dome formwork.
    The formwork elements for the dome were individually planned and pre-assembled. On site, the individual segments are quickly and efficiently installed.

    プレスリリース

    Zaha Hadid's dunes for the desert in UAE’s eastern district

    In the middle of the Sharjah Desert in the United Arab Emirates, a futuristic building is currently being constructed according to the plans of Zaha Hadid. As inspiration, the famous architect used nothing more than sand dunes. PERI is supporting this ambitious project with an individually-designed planning solution, project-specific formwork elements as well as by providing comprehensive support through its local team of experts.
    19
     
    1月
    Official groundbreaking ceremony for the next expansion phase of the PERI scaffolding plant in Guenzburg, Bavaria (f. l. t. r.): MDL Dr. Hans Reichart (Member of the federal state parliament), Dr. Fabian Kracht (Managing Director Finance and Organisation), Leonhard Braig (Managing Director Product and Technology), Dr. Rudolf Huber (Chief Executive Officer), Gerhard Jauernig (Lord Mayor Guenzburg), MDL Alfred Sauter (Member of the federal state parliament), Alexander Schwörer (Managing Director Sales), Stephan Finkel (Managing Director Plant Guenzburg).

    プレスリリース

    Groundbreaking ceremony for the next expansion phase of the PERI plant in Guenzburg

    PERI GmbH sets course for further growth. The family-owned company, one of the world's largest manufacturers and suppliers of formwork and scaffolding systems, is massively increasing its production capacities. Today, the official groundbreaking ceremony for the next expansion phase of the scaffolding plant in Guenzburg, Bavaria, took place.
    08
     
    1月
    Formwork, scaffolding, engineering: PERI supported site operations with a project-specific formwork and scaffolding concept.
    From intake to outlet structure, the new, second lock has a total length of 312 m.
    For realizing the Moselle Lock in Trier, around 45,000 m³ of concrete was processed during the construction period of almost 1.5 years.

    プレスリリース

    Project-specific formwork solution with high level of prefabrication

    The realization of the new, second Moselle lock presented a challenging construction project for all those involved in the undertaking whereby numerous mounting components and strict tolerance specifications had to be taken into consideration. Working in close cooperation, PERI supported the construction site managers from Hochtief Infrastructure GmbH with a project-specific formwork and scaffolding concept, just-in-time deliveries of accurately pre-fabricated formwork elements as well as continuous on-site support.
    12
     
    12月
    The winner of the 11th Construction Exercise: Maxim Rotzalski from RWTH Aachen.
    All participants of the final round of the 11th PERI Construction Exercise along with their supervisors as well as the PERI organization team together in the PERI GmbH exhibition hall in Weissenhorn.

    プレスリリース

    Expert jury determines the winners of the 11th PERI student competition

    PERI offers all educational and training institutions involved in the field of construction the opportunity to participate in its well-known Construction Exercise, which not only provides valuable experience with specific practical application but also the chance to win attractive cash prizes.
    04
     
    12月
    Scaffolding the two pylons of the Williams Bridge was carried out with a PERI system combination of PERI UP and VARIOKIT.
    The projecting LGS protective roof construction on both sides ensured the safe use of the road bridge during scaffolding assembly and refurbishment work.
    40 m of carriageway bridging: overnight, the 21 m long, pre-assembled VARIOKIT Truss Girder units were lifted and coupled to VST Shoring Towers using a mobile crane. At 6 o'clock in the morning the bridge could be re-opened for traffic.

    プレスリリース

    PERI system combination for challenging pylon scaffolding

    The refurbishment of the pylons on Rotterdam's Williams Bridge proved to be a tremendous challenge for installing the scaffolding. The project-specifically designed PERI scaffold solution was based on two systems that could be combined with each other almost seamlessly: PERI UP and VARIOKIT.
    01
     
    12月
    Dr. Rudolf Huber

    プレスリリース

    Changes in the Advisory Board and in the Group Management of the PERI Group

    The shareholders and the Advisory Board of the PERI Group have decided to change the management organization of the family-owned company: As of January 1, 2018, the Group Management of three managing directors, will be extended by a Chief Executive Officer (CEO) and thus, from this date on, will consist of four persons.
    23
     
    11月
    The PERI UP Modular Scaffolding Kit has been designed in such a way to ensure that a very wide range of applications can be achieved with just a few different system components. This guarantees an increase in cost-effectiveness along with a range of other benefits for users.
    The PERI UP Modular Scaffolding Kit has been designed in such a way to ensure that a very wide range of applications can be achieved with just a few different system components. This guarantees an increase in cost-effectiveness along with a range of other benefits for users.
    PERI UP Easy is one of the lightest steel facade scaffolds on the market. In addition, it provides a very high level of safety in the system as the guardrail for the next level is mounted with the Easy frame without requiring any additional components from the lower scaffolding level. The compatibility with components of the modular scaffolding ensures innovative, efficient solutions.

    プレスリリース

    The PERI UP Modular Scaffolding Kit – more system in scaffolding operations

    Safety requirements on construction sites are steadily increasing, scaffolding projects are becoming more and more complex and the cost pressures companies are facing is high. As a result, this not only changes the day-to-day challenges for the contractors but also the demands placed on the scaffold systems themselves. The question therefore arises whether a rigid differentiation of frame and modular scaffolding is still relevant today. After all, the market demands a product that contains both frame and modular scaffolding features as well as having the right solution in the system ready for every task. The PERI UP Modular Scaffolding Kit fulfills this requirement in every respect.
    02
     
    11月
    For the twin-tube tunnel segments, the construction team forms and concretes the bottom slab and walls in a single pour, then the slabs using two VARIOKIT Formwork Carriages. Among other things, the limited work space in the dry dock poses a number of challenges.
    The slab formwork carriages used are very modular in their design; the great flexibility of the VARIOKIT standard components facilitate simple adjustments to suit project-specific conditions. The relatively low weight of the VARIOKIT solutions is an additional benefit of the Engineering Construction Kit.
    As far as possible, the PERI planning includes the use of standard system components. For the special shape of the arch, the team developes a project-specific formwork solution.

    プレスリリース

    Underwater tunnel connects the banks of the Göta älv river

    One of the most interesting tunnels in Scandinavia, the Marieholm Tunnel, is currently being realized in the city of Gothenburg. In future, the 306 m long underground connection will ensure that the river Göta älv can be quickly crossed using the available six vehicle lanes. The structure is being constructed in the form of an immersed tunnel: three tunnel sections, each measuring more than 100 m long, are being produced in a dry dock with the help of a PERI VARIOKIT Tunnel Formwork Carriage and will subsequently be submerged in a trench excavated on the riverbed.
    05
     
    10月
    PERI has provided the product catalogues for the MAXIMO and SKYDECK formwork systems for direct integration in Autodesk® Revit®. A major help for all designers who want to visualise the later concrete finish during the initial modelling, for example.

    プレスリリース

    Planning PERI formwork systems in Autodesk® Revit®

    Autodesk® Revit® software for Building Information Modelling (BIM) includes functions for architectural planning and design, building technology, structural engineering and construction. Interested users can now integrate the PERI product catalogues for formwork systems MAXIMO and SKYDECK in Revit® and plan in the software using PERI system components.
    28
     
    9月
    When finished, the 77-storey high-rise building will have a total height of 324.50 m.
    Located right next to the striking Petronas Towers is another architectural highlight in Kuala Lumpur: the Four Seasons Centre.
    The RCS Climbing Protection Panel used provided a continuous, circumferential enclosure of the upper storeys under construction. An important requirement of the construction work, which demanded a high level of safety for the construction team, was thus fulfilled.

    プレスリリース

    Luxury hotel construction ahead of schedule thanks to comprehensive PERI support

    Situated in the shadow of the famous Petronas Towers, one of the most luxurious hotels in the world is currently being realized. For the building complex – the so-called Four Seasons Place – the PERI engineers developed an efficient scaffolding and climbing formwork solution. The most important goal was to facilitate efficient work operations and, at the same time, provide a high degree of safety for the personnel on site. Result: construction process is far ahead of the original planned schedule.
    27
     
    9月
    Official opening of scaffold production in Günzburg / Bavaria
    Official opening of scaffold production in Günzburg / Bavaria
    Official opening of scaffold production in Günzburg / Bavaria

    プレスリリース

    Official opening of scaffold production in Günzburg / Bavaria

    Weissenhorn‑based PERI GmbH has planned further growth in its scaffolding division and to this end has created the required production capacities. As any expansion possibilities at the main plant in Weissenhorn are limited, a new manufacturing facility in the neighbouring town of Günzburg is beeing build since January 2016. The primary plant for the PERI UP scaffolding technology was officially opened on 22 September 2017.
    04
     
    9月
    Demolition of the centrally located Syngenta high-rise building was hardly noticed in the immediate surroundings.
    Within the RCS Climbing Protection Panel, materials were carried off on each floor using small demolition excavators.
    Adapted to match the building floor plan, the enclosure ensured that all demolition work could always be safely carried out – for the benefit of the jobsite team and passers-by.

    プレスリリース

    Virtually unnoticed: Demolition work on high-rise building within RCS enclosure

    The Swiss agricultural company, Syngenta, is completely transforming its headquarters in the centre of Basel. For this, a 54 m high tower block had to be removed. Due to the position of the building which is directly adjacent to the corporate campus as well as in close proximity to the highly frequented Schwarzwaldallee and the Badischer Bahnhof, demolition using large demolition excavators was out of the question. PERI engineers in collaboration with contractor ERNE AG developed a concept on the basis of the RCS Rail Climbing System which allowed a safe and efficient dismantling of the structure within an all-round enclosure.
    01
     
    9月
    The innovative and tried-and-tested MAXIMO panel formwork has been adapted to accommodate the technology of single-sided anchoring and can be used very flexibly.
    Depending on the fresh concrete pressure and wal thickness, the Tie MX 15 or MX 18 is used. In the process, a removable sealing allows fast and simple adaption to suit both sizes of anchor.
    The MXK bracket system provides a high level of safety whilst requiring only a minimum of installation effort. The lightweight system components can be installed on the ground by hand.

    プレスリリース

    A decade of maximum efficiency for forming walls

    Presented for the first time at the bauma 2007, the MAXIMO panel formwork continues to make a convincing case even a decade later through its enormous economic efficiency. In particular, the tie technology that was developed ten years ago by PERI leads to significantly smaller numbers of jobsite personnel thus resulting in considerable time and cost savings. Over the years, PERI engineers have continually expanded the application areas of this innovation. This is why the PERI MAXIMO can be found on countless construction sites in Germany and around the world.
    03
     
    8月
    The future highest high-rise building in Europe is currently being realized in Saint Petersburg: the headquarters of the energy company Gazprom will reach a total height of 462 m. Spectacular multi-functional buildings, an amphitheater and spacious parks complement the complex.
    In particular, the spectacular location directly on the Finnish Jade Bight brought with it some special challenges. The foundations were complex not only because of the building´s height and high wind loads but also because of the existing ground conditions.
    For the spiral-shaped core of the high-rise structure, PERI planned and delivered an efficient formwork solution based on the ACS Self-Climbing System. Crane and weather-independent work operations accelerated the construction progress.

    プレスリリース

    Formwork and scaffolding from one source for the highest skyscraper in Europe

    With its very impressive architecture, the Lakhta Center, a futuristic building complex designed by Tony Kettle, is the new highlight of Saint Petersburg. Eventually rising to a height of 462 m, the multi-storey building in the centre of the complex will not just surpass all other structures in Russia when it is completed. Rather, the high-rise building on the Finnish Jade Bight will be the tallest building in Europe. Faced with numerous formwork and scaffolding challenges, PERI has been providing the contractor with expert support throughout the project – from formwork solutions for the record-breaking foundations through to complex shoring arrangements.
    01
     
    7月
    On two artificial islands at both exits of the HZMB tunnel, striking architectural concrete structures are currently being built. On the right of the picture, the exit at the west end of the tunnel can be seen. (Graphic: © China Communications Construction Company Ltd. CCCC)
    The directions of travel for the tunnel are separated by 15.50 m high reinforced concrete walls. Supported on the walls is a steel structure which serves as a sun shield. The multi‑storey building is being build in the lengthening of the tunnel entrance.
    With the PERI solution, the construction team achieved the best SB 4 architectural concrete quality with a clearly structured joint and tie arrangement as well as permanent water impermeability for the walls of the tunnel entrance.

    プレスリリース

    With PERI know-how and support for the best architectural concrete quality

    Since 2010, PERI has been supporting the construction of the 6 km long underwater tunnel section of the fixed link between Hong Kong and Macao / Zhuhai with the provision of two forming machines. The excellent cooperation has led to additional orders: PERI has provided professional engineering services and project‑specific formwork solutions for achieving the best possible architectural concrete results as well as large time‑savings during construction work for the tunnel portals and two operation buildings.
    01
     
    6月
    A total of seven buildings form the new Maakri Quarter in the heart of Tallinn: a very striking multi-storey structure over 100 m high while surrounding historical buildings are being extensively renovated.
    For the new landmark of the district, PERI engineers developed a climbing formwork solution on the basis of the RCS Rail Climbing System. The continuous guidance of the units on the building ensured safe climbing procedures even during strong winds.
    The RCS Rail Climbing System was also used in Tallinn as a climbing protection panel and thus provided a safe, gap-free enclosure for the floors of the shell construction.

    プレスリリース

    Fast high-rise construction progress with a well thought-out formwork concept

    A total of seven buildings characterize the Maakri-Kvartal complex which is currently being built in the Estonian capital. The project comprises new high-rise buildings as well as restored architectural monuments and connects the historical heart with the newer district of Tallinn. PERI developed and delivered corresponding formwork solutions for the new structures as well as the renovation work. The PERI team has supported the rapid construction progress in particular with climbing technology for the city´s new landmark – a high-rise building with a height of more than 100 m.
    02
     
    5月
    Designed by Zaha Hadid, the new station – a construction consisting of concrete, glass and steel in the form of a bridge – is characterized by numerous curved shapes. Traffic flows from travelers inspired the architect to create this extraordinary shape.
    For the design of the very special “Porta del Sud” architecture, PERI´s Italian engineers developed a cost-effective overall solution for all formwork and scaffolding work. In addition to standard formwork systems, a large number of customized formwork elements were planned, produced and delivered.
    The project in numbers: 19,000 m² of reinforced concrete slabs and 26,500 m² of wall areas – of which 16,500 m² in the best possible architectural concrete quality.

    プレスリリース

    Comprehensive PERI solution for the very impressive "Doorway to the South"

    At the beginning of June 2017 the “Porta del Sud” near Naples is scheduled to be opened. Christened with this name, the ultra-modern railway station for high-speed trains in Naples Afragola forms the major intersection on the Rome-Neapel-Salerno line. The bold architectural design of the station bears all the hallmarks of Zaha Hadid. PERI developed a comprehensive formwork and scaffolding solution for the realization of the curved architectural language of the famous architect.
    03
     
    4月
    Up to 70,000 visitors flock daily to Australia's largest shopping centre which is now completely covered by a gigantic glass roof – the result of an expansion project. Work was carried out while the centre remained opened for daily business; the schedule for the entire construction project was extremely short. (Photo: David McArthur Parallax Photography)
    The undulating glass roof provides Australia's largest shopping centre with a very distinctive design feature. The unique configuration has already attracted a lot of attention. (Photo: David McArthur Parallax Photography)
    PERI Australia supported the scaffolding contractor with a comprehensive planning solution for the up to 20 m high load-bearing shoring and working scaffold up to 85 m long. Thanks to the lightweight system components, the scaffolding could be erected and dismantled without a crane – so that the restricted crane availability did not jeopardize the scheduled completion date. (Photo: David McArthur Parallax Photography)

    プレスリリース

    PERI UP for an architectural highlight ”Down Under“

    In Melbourne, the continent´s largest shopping centre has been renovated and expanded. Now an architecturally demanding, curved glass construction covers the Chadstone Shopping Centre which was opened in 1960. For the scaffolding contractor, the biggest challenge was to meet the extremely tight timetable in spite of only minimum crane availability. The project-specific planning service provided by PERI Australia´s engineers, together with the system advantages of the flexible PERI UP Flex Modular Scaffolding, helped the construction team to complete the work within the very tight time schedule.
    03
     
    3月
    The realization of starter units which form the foundation for the tunnel-in-tunnel. This area is formed with custom steel formwork. The two support areas – one for the rising wall, another for the prefabricated panel which is mounted at the end of all reinforced concrete work and subsequently forms the bottom carriageway slab – are clearly visible.
    The rising walls are concreted directly on the starting units which in turn form the support for the upper roadway. Two MAXIMO Formwork sets ensure fast, efficient concreting of the 4.50 m high walls.
    The slab was subsequently concreted by means of a total of six formwork carriages – constructed using the back-step construction method.

    プレスリリース

    PERI Formwork Carriage follows one of the world´s largest tunnel boring machines

    As a replacement for the elevated viaduct that is used daily by 110,000 vehicles, a 3.2 km long tunnel is currently being constructed. PERI planned and delivered a project-specific formwork solution for the realization of the double-storey carriageway whereby the previously drilled tunnel tube length is being concreted in three sections each time.
    09
     
    2月
    Within the last year, the universal formwork system DUO has been tried and tested on several jobsites in the US and around the world to ensure it meets all contractors requirements.
    DUO panels are clamped together in seconds with a coupler resembling a door handle in both appearance and motion. Without the need of any tools, this makes DUO a silent system, especially useful in residential applications.
    Walls and foundations are formed quickly and efficiently with very few parts and pieces required.

    プレスリリース

    DUO Market Launch in the US

    PERI USA launches a new lightweight formwork system made from fiber reinforced polymer. The versatile panels feature 3 in 1 functionality and can be used to form walls, slabs and columns.
    01
     
    2月
    Neuschwanstein Castle is one of Germany's most famous sights. Every year around 1.5 million tourists from all over the world visit the cultural monument near Füssen.
    The eastern gateway building at Neuschwanstein Castle is currently completely scaffolded with PERI UP Flex whereby a temporary weather protection roof spans the access to the castle.
    Heated roof tarpaulins minimize snow loads on the temporary scaffold roofing.

    プレスリリース

    Well equipped and heated through the winter

    For scaffolding and enclosure of the gateway building, the PERI UP Flex scaffold solution has been optimally adapted to suit the local site conditions and static requirements. The exclusive use of system scaffolding components thereby accelerated the assembly work and, at the same time, increased safety levels during the use of the scaffold. For the first time in scaffolding, heatable roof tarpaulins ensure that the formation of unwanted snow loads are prevented during the winter months.
    30
     
    1月
    The PERI DUO Universal Formwork is the winner of the “Best Innovation Product Award” category at the “Kostroi Angola 2016”.
    For the fourth time now, PERI exhibited at the bauma CONEXPO in Neu-Dehli. Among other things, DUO, ALPHAKIT, SKYDECK, GRIDFLEX, VARIO, LIWA and PERI UP were showcased.
    Also in India's second largest city, there was a prize for the DUO system. The “Construction Opportunity Excellence Award” went this year to the innovative formwork from Weissenhorn.

    プレスリリース

    PERI DUO continues to garner additional awards

    The PERI DUO universal formwork system continues to attract a very positive response: two more bodies - one in Angola, another in India – have awarded the new technopolymer-based formwork with corresponding innovation prizes.
    23
     
    1月
    The individual, pre-assembled formwork units are provided with a QR code which allows direct access to a wide range of data via one mouse click. Thus, drawings or assembly instructions are linked with the 3D model.
    Checklists for previously defined workflows ensure perfect, digital documentation - directly linked to the relevant formwork model.
    Points to be clarified or even collisions can be marked and described directly on the model by construction team personnel. The solution-relevant information is also transparent for all project participants via defined communication channels.

    プレスリリース

    Practical applications for BIM

    PERI is currently planning the formwork and scaffolding solution for the construction of the Filstal Bridge on the Wendlingen-Ulm rail connection. This bridge was defined by the Federal Ministry of Transport and Digital Infrastructure (BMVI) as one of four pilot projects whereby the application of Building Information Modeling (BIM) is being tested and scientifically evaluated. This article describes some specific BIM practical applications which PERI has defined and implemented on this bridge in close collaboration with the contracting JV, Max Bögl / Porr.
    19
     
    1月
    Through the integrated scaffold nodes on the PERI UP Easy Frame, ledgers, supports and console brackets can be directly connected. This makes it possible, e.g., to also easily mount external flights of stairs; these provide convenient and safe access to all areas.
    The integrated protection against lifting in the scaffold decking in detail: the integrated clamp engages the rectangular ledger and thus secures the position of the decking. PERI UP decks are also secured against lifting after installation without requiring any additional components.
    PERI UP decking always completely covers the entire axial dimesnions; there are no gaps or offsets between the decks – both from bay to bay as well as decks positioned parallel to each other. Covers for gaps in the decking are not required.

    プレスリリース

    From planning to implementation

    Enhanced safety along with maximum flexibility: the new PERI UP Easy* facade scaffold system solves two of the most important challenges faced in day-to-day construction site operations as the new frame scaffold supports safe and fast assembly. In addition, the integrated scaffolding nodes allows PERI UP Easy to be combined with the PERI UP Flex modular scaffolding thus ensuring maximum flexibility even when dealing with complex building geometries. Furthermore, PERI offers its customers a wide range of services relating to planning, tendering and project execution through to the entire planning and construction process.
    19
     
    1月
    Big intake at BAU 2017: On the first two days already, PERI counted significantly more visitors than in 2015. The interested persons were particularly closely scrutinizing the PERI novelties.
    Craftsmen and other interested parties were buzzing around the new PERI DUO, furthermore the innovative PERI UP Easy frame scaffold got a lot of positive feedback.

    プレスリリース

    Innovative Systems for craft producers – Competence in project solutions for planners

    What can one of the largest internationally operating suppliers of scaffolding and formwork systems possibly offer smaller construction companies, tradesman or municipal building enterprises? And with what services does the manufacturer also support the planning phase for construction projects? PERI answered these questions and much more to visitors at the BAU 2017. At the beginning of the year, PERI presented in Munich great solutions to trade fair visitors – and gained particularly positive acclaim.
    09
     
    1月
    Mersey Gateway Bridge, Runcorn to Widnes, Great Britain
    Mersey Gateway Bridge, Runcorn to Widnes, Great Britain: Horizontally-positioned SB Brace Frame Units
    Landmark Mersey Gateway on form with help from PERI

    プレスリリース

    Landmark Mersey Gateway on form with help from PERI

    Merseyside in North-West England is embracing significant improvements to its transport systems thanks to the landmark construction of the Mersey Gateway. The road bridge over the River Mersey is an integral component of the new A533 Central Expressway. Located 20 km east of Liverpool, it will provide an important transport connection between the towns of Runcorn in the south and Widnes in the north.
    23
     
    12月
    PERI GmbH Group Management Board: Dr. Fabian Kracht (Managing Director Finance and Organization), Alexander Schwörer (Managing Director Sales and Marketing) and Leonhard Braig (Managing Director Products and Technology).
    A good start to 2016: around 175,000 visitors came to the specially constructed PERI hall during the duration of the world´s leading trade fair in Munich. The PERI DUO and PERI UP Easy product innovations were of particular interest.
    A total of 44 storeys wind their way elegantly upwards on the so-called Generali Tower in Milan (Italy). The clever climbing formwork solution for the project by Zaha Hadid is yet another trend-setting development from PERI.

    プレスリリース

    Targeting worldwide growth

    PERI can look back with great satisfaction at events in 2016 and retains a positive outlook regarding future business development. Special highlights of the year included participation at the world´s leading trade fair, bauma, where the latest innovations from Weissenhorn were showcased as well as the purchase of a site in Günzburg (about 20 km from headquarters in Weißenhorn) on which the master production plant for PERI UP scaffolding technology is currently being realized. As a result, PERI has provided the right impulse and set the course for the future.
    05
     
    12月
    Combined with a heating element, MAXIMO also offers the right solution for concreting at low temperatures. The heat supply provides an uninterrupted hydration process – as shown here in winter in Finland.
    Practical details such as suitable recesses for the BFD connections ensured efficient use of the MAXIMO MXH Heated Formwork.
    Suitable recesses for connecting the Bracket System MXK are also provided in the MAXIMO MXH Heated Formwork. The MXK Bracket System served as a safe working and concreting platform.

    プレスリリース

    Warmly wrapped up in winter: extended pouring times at sub-zero temperatures

    Around 30 km to the north of Helsinki, the so-called Domino Complex is currently being realized – for the construction company, this has meant maintaining an extremely tight construction schedule from the beginning onwards. This brought great challenges particularly regarding the reinforced concrete work carried out during the long Scandinavian winter. Thanks to the use of the MAXIMO MXH Heated Formwork, which was recently introduced into the market, the construction team was able to meet the strict schedule as well as to precisely carrying out concreting operations at sub-zero temperatures.
    28
     
    11月
    The great interest in the 4th Lake Constance 5D Conference once again shows the great importance of the exciting topic.
    PERI discussed specific, practical applications of BIM in the field of formwork and scaffolding technology with many interested parties.

    プレスリリース

    Successful participation in the Lake Constance 5D Conference 2016

    On 25 and 26 October 2016, the "Lake Constance 5D Conference" took place for the fourth time at the University of Konstanz. Once again, PERI was a major sponsor of this international event and also contributed to the design of the conference proceedings.
    16
     
    11月
    Professors from civil engineering faculties at universities in Germany and Austria came to Weissenhorn at the invitation of PERI, and were informed about the latest developments in the area of formwork and scaffolding systems during their two-day visit.
    At the PERI training centre in Weissenhorn, the participants were divided into small groups and introduced to the latest solutions using a very practical approach.
    On the basis of the live product demonstrations, the professors were able to familiarize themselves in greater detail with the innovative solutions such as the ACS Core 400 core self-climbing formwork.

    プレスリリース

    Specialist symposium on construction operations: PERI demonstrates latest know-how to the universities

    On 8/9th November 2016, formwork and scaffolding manufacturer, PERI, invited university professors for the eighth time to the company´s headquarters. At the training centre in Weissenhorn, more than 40 lecturers from civil engineering faculties in Germany and Austria took the opportunity to get in-depth and practical insights into state-of-the-art construction methods in the area of formwork and scaffolding technology. The main focus was on new and further developed systems, online services and various aspects in research and development.
    11
     
    11月
    PERI recently received the prestigious "Supply Chain Management Award 2016" for a new logistics concept. On behalf of the international team, Ramona Held and Dr. Bernd Rosenkranz (centre) accepted the award from jury members Dr. Petra Seebauer (right) and Harald Geimer (left) along with the previous year's winner and laudator, Johannes Giloth.
(Photo: André Baschlakow/EUROEXPO)

    プレスリリース

    Efficient planning ensures optimal material availability worldwide

    At the beginning of October 2016, PERI once again proved that the company continues to operate at an international level in terms of innovation: at a logistics conference, the Supply Chain Management department was awarded the "Supply Chain Management Award 2016" for its innovative logistics concept. Excellent planning is not just a requirement of the company but is in fact indispensable in order to provide customers with the appropriate formwork and scaffolding systems at all times. The innovation prize confirms that the solution developed in the company is indeed first class.
    03
     
    11月
    Situated next to the famous Vienna Prater amusement park, seven distinctive and up to 33 m high residential towers are currently being realized.
    The walls are formed in advance using TRIO 330 which is climbed with the help of FB 180 Folding Platforms; wall and slab formwork operations as well as the complex construction of the circumferential cantilevered balconies are carried out separately.
    The TRIO Wall Formwork and SKYDECK Slab Formwork have ensured fast working operations in order to be able to maintain the extremely short construction schedule of only 10 months.

    プレスリリース

    Vienna housing construction project in two-quarter time

    With a similar amount of zest and energy as the Viennese Waltz in three-quarter time, seven extravagantly shaped residential towers are currently being constructed adjacent to the famous Prater amusement park in Vienna. Perfectly matched PERI formwork, scaffolding and safety solutions ensure a high concreting cycle frequency in order to meet the extremely tight construction schedule.
    18
     
    10月
    BAU 2017
    PERI UP Easy is a “lightweight“ among the range of steel facade scaffolds. In addition, it provides safety in the system.
    With PERI UP Easy, the guardrail for the next highest level is mounted with the frame from below each time. As a result, the scaffolder is already secured when entering the next level – and thus requires no personal protective equipment during the erection of the basic structure.

    プレスリリース

    PERI at BAU 2017

    What can one of the largest internationally operating manufacturers of scaffolding and formwork systems possibly offer smaller construction companies, tradesman or even municipal building enterprises? Quite a lot as it happens – as shown by the range of options PERI is presenting at BAU 2017. The fact is such companies can also profit from innovative products, supporting services and the know-how gained from major projects. 
    11
     
    10月
    Your advantages in the use of CENTRIO CLM

    プレスリリース

    Process support without media disruptions

    Software firm CENTRIO is a subsidiary of PERI GmbH, specialising in the digitalisation of the construction industry. The CENTRIO CLM software solution offered by CENTRIO has already been used successfully for 20 years to manage data and information at PERI, and has been continually reinvented and refined throughout that time. Now the system is being offered to external customers too. The focus of CENTRIO CLM is a digital construction file combining all data and information in a clear system.
    05
     
    10月
    Three elevated high-rise structures for the new SPRM administrative centre. PERI supported the construction progress with an efficient climbing solution, complex shoring construction along with a comprehensive range of services.
    Working scaffold, bracing and shoring all rolled into one: PERI UP subsequently followed as birdcage scaffold within the cycle of the RCS Climbing Formwork.
    On the basis of the RCS Rail Climbing System, the inclined circular columns could be efficiently constructed.

    プレスリリース

    Know-how from a single source for all construction tasks

    In the government district of Putrajaya, a new administration building of the Malaysian Anti-Corruption Commission (Suruhanjaya Pencegahan Rasuah Malaysia: in short, SPRM) is being realized. For constructing the elevated high-rise complex, PERI planned and delivered the formwork and scaffolding solution from a single source. The systems used were perfectly matched to one another resulting in a safe and time-saving execution.
    29
     
    9月
    PERI officially inaugurated its new site in Boom near the Belgian city of Antwerp in Belgium.
    Jeroen Baert (mayor of Boom) and Ludwig Caluwé (delegate of the province of Antwerp), together with PERI’s national and international management, officially inaugurated the new site and modern building.
    The new PERI site in Belgium was solemn inaugurated by Alexander Schwörer, Managing Director of Marketing and Sales of the PERI Group.

    プレスリリース

    PERI opened a new business site in Boom, Belgium

    PERI, a manufacturer and supplier of formwork, scaffolding, and engineering services, officially inaugurated its new site in Boom near the city of Antwerp. In keeping with PERI’s motto ‘Shaping the Future. The discovery’, customers, industry associations, regional politicians, journalists and many other interested people explored the company’s range of services and products, its know-how and its new headquarters in Belgium.
    22
     
    9月
    The Konzil Building in Constance
    The Lake Constance 5D Conference
    BIM for detecting interface problems promptly

    プレスリリース

    PERI once again lead sponsor of the 5D Conference

    PERI is again acting as a lead sponsor of the 5D Conference in 2016. The event organised by the HTWG Konstanz University of Applied Sciences focusses on the technology of process-oriented 5D simulation. The Conference is also being held this year on 25th and 26th October in the Konzil Building in Constance.
    13
     
    9月
    Continuous construction below: the parapet track is secured to the bridge underside by means of rails and rollers, and the bridge is freely accessible.
    Continuous construction above: with parapet carriages, horizontal loads are carried via friction; anchoring is not required.
    One alternative is immovable brackets.

    プレスリリース

    Planning and testing of Cantilevered Parapet Brackets and their respective anchoring

    In the coming years, an increased need for new buildings and refurbishment of bridges can be expected in Germany. As a result, the number of cantilevered parapets to be realized will also increase. For their removal and construction, bracket scaffolds are normally used which are anchored to the bridge. In the following article, a number of the essential factors regarding load transfer that occur in bridge structures are described, and which are to be taken into consideration during the planning and testing of brackets and their anchoring.
    05
     
    9月
    Henninger Turm, Frankfurt am Main
    Henninger Turm, Frankfurt am Main
    Henninger Turm, Frankfurt am Main: The upper landing platforms were integrated into the RCS enclosure and climbed crane-independently together with the protection panel unit to the next section in each case. In the floors immediately below, crane-movable RCS MP Landing Platforms served as a temporary storage areas for crane transportation.

    プレスリリース

    Project support at the very highest level

    The Henninger Turm, with its very distinctive barrel-shaped top section, was and is once again one of the landmarks of Frankfurt. With formwork, scaffolding and a comprehensive range of services, PERI provided project-specific execution solutions for every stage of the construction from a single source.
    24
     
    8月
    The parapet track is mounted to the bridge underside by means of rails and rollers. The bridge is freely accessible; traffic is unhindered.
    With parapet carriages, horizontal loads are completely transferred via friction; anchoring is not required.
    The cantilever parapet bracket with a closed working platform is the optimal solution for refurbishment projects but can also be used for new structures.

    プレスリリース

    Construction of cantilevered parapets for new bridge constructions and bridge refurbishment

    In the coming years, an increased need for new buildings and refurbishment of bridges can be expected in Germany. As a result, the number of cantilevered parapets to be realized will also increase. For their removal and construction, bracket scaffolds are normally used which are anchored to the structure. During the planning phase, the construction site situation must be properly assessed and a suitable bracket scaffold selected, including the anchoring, in order to minimize risks and costs as well as avoiding any construction delays. PERI offers a closed system consisting of brackets and anchors that enhances planning reliability and work safety which ultimately results in cost savings.
    03
     
    8月
    Lo Storto, The Twisted One, the future administrative building of the Generali Insurance Group
    The 170 m high office tower bears – as does the residential development section of the Milan CityLife project – the handwriting of the recently deceased star architect, Zaha Hadid.
    The complete enclosure using the RCS Climbing Protection Panel reliably secured the top floors under construction each time.

    プレスリリース

    Twisted highrise architecture from Zaha Hadid

    The 170 m high office tower in Milan elegantly winds its way upwards and bears the signature of Zaha Hadid. Through the interplay of perfectly coordinated formwork and scaffolding solutions on the basis of a well thought-out safety concept, the shell construction could be completed within just 17 months.
    26
     
    7月
    PERI supported the construction project of the century with the planning and delivery of huge quantities of formwork and scaffolding systems.
    An essential element of the PERI solution was the new SCS Climbing System – with simple handling and transfer of heavy loads.
    The SCS Climbing System in use on inclined structural components. The working platforms can be tilted ± 15° and ± 30° which means site personnel can always work safely.

    プレスリリース

    PERI convinces through innovative climbing technology and a very impressive performance

    The expansion of the second most important waterway in the world is finished. Since the end of June 2016, large container ships can now also pass through the around 80 km long Panama Canal which connects the Pacific with the Atlantic. For PERI, it meant that the largest individual order in the 47-year history of the company had finally been completed.
    13
     
    7月
    Product Manager, Helmut Baechle (PERI Weissenhorn), Marketing Coordinator, Stéphanie Derouet, and the Manager of the Technical Office Thierry Chancibot (both PERI France) are highly delighted with the prize.
    The DUO Formwork System celebrated its world premiere in Munich at the international trade fair, bauma 2016. The innovative product made a very convincing case with its very light system components as well as easy handling. In addition, the system components can be used for forming walls, columns and slabs.
    DUO is the new system formwork which is characterized by its low weight and very simple handling. The innovative feature is not only the material used but also the entire concept: efficient forming using only a minimum number of different system components for walls, foundations, columns and slabs.

    プレスリリース

    Gold for the innovative, versatile DUO System Formwork

    The innovative PERI DUO Formwork System recently received a very special award: communications specialists, SAGERET, one of the major providers of industry information in France, presented this important prize for the very first time.
    04
     
    7月
    Dubai Frame, United Arab Emirates: The customized climbing formwork solution combined three different ACS self-climbing versions with VARIO Girder Wall Formwork and TRIO Panel Formwork.
    Dubai Frame, United Arab Emirates
    Dubai Frame, United Arab Emirates: The climbing units, consisting of wall formwork and platforms, were moved from storey to storey using an integrated hydraulic system.

    プレスリリース

    Climbing formwork solution for angular geometry of a gigantic frame

    An exceptional, walk-in work-of-art structure has been created in the capital of the Dubai emirate: a huge frame whose glass crosspiece provides visitors with a spectacular view. For realizing this building assignment, PERI formed a project team comprised of climbing and formwork specialists. From the very beginning through to the end, they supported the complex shell construction with precisely matched execution solutions. As a result, the angular core geometry could be realized within the very tight dimensional tolerances; in addition, 30 days construction time could be saved.
    28
     
    6月
    PERI employees - user of the BIM software
    BIM in use for the Filstal Bridge
    During bauma 2016, Alexander Dobrindt, Federal Minister for Transport and Digital Infrastructure, visited the PERI stand (shown here with Christl Schwörer and Alexander Schwörer)

    プレスリリース

    Planning software and BIM applications for formwork and scaffolding technology

    For many years now, the PERI portfolio has included software for the planning of application solutions with PERI systems. PERI CAD planning software is used worldwide by both PERI engineers as well as contractors, and is being continuously further developed and refined. In addition, the formwork and scaffolding provider has been intensively involved in the current trend of Building Information Modeling (BIM).
    17
     
    6月
    DUO celebrated its world premiere at the international trade fair bauma 2016 in Munich. The innovative product convinces thanks to very lightweight system components and a design focussed on simple application. Furthermore, system components can be used for forming walls, columns and slabs.
    The PERI Group Management announced a 13 % increase in turnover at the start of 2016 compared to the previous year: 7,700 employees worldwide generated a turnover totalling EUR 1.3 billion. Pictured from left: Dr Fabian Kracht (Managing Director Finance and Organisation), Alexander Schwörer (Managing Director Sales and Marketing) and Leonhard Braig (Managing Director Product and Technology).
    The launch event of the PERI subsidiary in Tanzania (f.l.t.r.): Theunis Visser, PERI Business Development South Africa; Johan Issack M. Peter, Director of Innovation, National Housing Corporation Tanzania; and Giuseppe Rosiello, Managing Director PERI Tanzania.

    プレスリリース

    International Industry Leader comes to Tanzania

    Tanzania was quickly identified as a key location for expansion in Southern Africa. The stable political landscape, a favourable geographic location and forecasted growth provide an optimum environment for the establishment of PERI Formwork and Scaffolding Ltd. in Dar es Salaam.
    03
     
    6月
    Ohio River Bridge, Louisville, Kentucky, USA
    Ohio River Bridge, Louisville, Kentucky, USA
    Two Ohio River Bridge, Louisville, Kentucky, USA

    プレスリリース

    Climbing formwork and shoring solution for complex bridge pylons

    The almost 90 m high pylons for a new cable‑stayed bridge across the Ohio River are characterized by their complex shapes and massive legs and cross beams. PERI provided a comprehensive overall concept for its construction – consisting of a planning solution with perfectly matched formwork, climbing, shoring and scaffolding systems along with extensive on‑site support. With this PERI solution, the construction crew were able to realize the two bridge pylons in Louisville within the specified construction period and with low dimension tolerances.
    02
     
    5月
    Msheireb Metro Station, Doha
    Msheireb Metro Station, Doha, project-specific formwork and shoring concept
    Msheireb Metro Station, Doha, complex structural geometry

    プレスリリース

    Inner-city major construction site at a depth of 40 m

    PERI engineers supported the fast construction progress of the Msheireb Station, the key element of Doha's new metro system, with an individually tailored system concept and continuous on-site support.
    19
     
    4月
    PERI exhibition tent at bauma 2016
    bauma 2016: PERI exhibition hall
    bauma 2016: PERI formwork technology at a glance

    プレスリリース

    bauma 2016: An outstanding success for PERI

    At the 32nd Edition of the World´s Leading Trade Fair for Construction Machinery, Building Material Machines, Mining Machines, Construction Vehicles and Construction Equipment, around 175,000 visitors were recorded at PERI´s specially erected exhibition hall. The biggest attractions featured a number of interesting innovations: DUO Universal Formwork, SKYMAX Slab Formwork and the ACS Core 400 Core Climbing Formwork. PERI Managing Director, Alexander Schwörer, confirmed: "For us, bauma 2016 was a great success, and we are very satisfied with the positive feedback as well as the high quality of the fair visitors."
    12
     
    4月
    The new PERI UP scaffolding system is a "lightweight" among steel facade scaffoldings, and, in addition, it provides a high level of safety in the system: the guardrail for the next level is installed together with the Easy* Frame from the lower scaffolding level without requiring any additional components.
    Both the combi decking with a 66 cm width as well as the 33 cm wide steel decks are designed with the integrated lock against lift off. They can be removed at any time. Without exception, all decking covers the entire system width; there are no gaps between the decks.
    With PERI UP Easy*, internal and external corners are executed quickly and with very few system components.

    プレスリリース

    PERI Scaffolding Technology at bauma 2016

    Reports about new products for the target group of scaffolding contractors and industrial companies
    12
     
    4月
    For complex projects in civil engineering bridge construction, e.g. balanced cantilever solutions, PERI now provides even better support for its customers.
    Especially for use in high-rise building cores with medium to large dimensions, PERI has developed a core self-climbing formwork with a very high load-bearing capacity, all-round safety features and a continuous climbing procedure.
    With the type-tested VARIOKIT Cantilevered Parapet Bracket and an appropriate anchoring, PERI now provides a closed solution for parapet refurbishment.

    プレスリリース

    PERI Engineering Construction at bauma 2016

    Information about new products for the target group of engineering companies (bridge and tunnel construction; climbing technology)
    12
     
    4月
    DUO is the new system formwork which is characterized by its low weight and very simple handling. The innovative feature is not only the material used but also the entire concept: efficient forming using only a minimum number of different system components for walls, foundations, columns and slabs.
    The assembly steps are easy to understand, less experienced users of system formwork can also work quickly and efficiently with DUO.
    Versatility is the special advantage of the system. The panels can be utilised for forming walls, columns and slabs.

    プレスリリース

    PERI Formwork and Scaffolding Technology at bauma

    Information on new products for the target group of contractors in building construction; reports about new formwork systems as well as shoring solutions and the weather protection roof
    12
     
    4月
    PERI at the bauma 2016
    Company result in 2015
    Newly developed PERI apps

    プレスリリース

    Best solving expertise in formwork and scaffolding

    General information on our bauma appearance and the importance of bauma as an innovation platform; notes to the PERI project expertise and its presentation at bauma; information and news about PERI services and software solutions
    02
     
    3月
     Skyline of Tel Aviv with a view of the construction site for the Alon Towers
    The 164 m high twin towers (Alon Towers "BSR Center TLV", Tel Aviv, Israel), PERI Climbing Formwork and Protection Panels
    The self-climbing ACS P Platform variant has been adapted to suit the core ground plan while suspended DOMINO elements are being used for subsequent construction of the intermediate walls.

    プレスリリース

    Climbing systems cost-effectively matched to one another

    For a cost-effective execution solution, PERI´s Israeli engineers combined several climbing system variants. The system concept was perfectly matched with the climbing formwork and protection panels as well as exactly meeting construction site requirements.
    11
     
    2月
    A portrait of Dr. Fabian Kracht, director of Finances and Organisation at PERI GmbH and responsible for Human Resources.

    プレスリリース

    Germany's best employers in 2016

    German family-owned companies stand for long-term relationships, strong personalities and established products. PERI was named “Germany's best employers in 2016 – top 100” in a nationwide survey conducted by the news magazine Focus, which has now been published. PERI was voted number 7 in the group “Production and processing of materials and building materials, metals and paper” industry.
    03
     
    2月
    Formwork solution with system components of VARIOKIT Engineering Construction Kit
    Expansion of the European Route E6 in Norway
    The VARIOKIT cantilevered carriage from PERI: flexible Solution with fast assembly

    プレスリリース

    PERI balanced cantilever solution ensures optimized workloads

    In the course of the European Route E6 expansion in Norway, the plans include a 320 m long bridge which spans the Gudbrandsdalen Lågen river. For the bridge superstructure, PERI civil engineering technology experts developed a balanced cantilevered solution based on the VARIOKIT Engineering Construction Kit.
    25
     
    1月
    The new production facility will complement the main factory in Weissenhorn and expand the PERI capacities in scaffolding.
    PERI Management: Dr. Fabian Kracht, Alexander Schwörer, Leonhard Braig - production capacity for scaffolding systems

    プレスリリース

    PERI expands its production capacities for scaffolding systems

    The Weissenhorn-based company PERI has announced the purchase of the Silvergreen site in Günzburg. The new location will complement the main plant in Weissenhorn as the expansion possibilities there are very limited.
    19
     
    1月
    bauma is the most important trade fair for the construction industry. Every three years, the industry meets in Munich for a show of strength and informs an expert audience about the latest developments.
    Especially for markets with colder climates, PERI has developed the MXH Formwork System.
    The app offers the best possibilities to optimize the slab formwork regarding the component needs.

    プレスリリース

    Best problem-solving expertise in formwork and scaffolding

    From 11th to 17th April 2016 in a 4,200 m² exhibition hall in the Open-Air Area North, PERI will be presenting the very latest formwork and scaffolding technology. The focus is on a range of innovations, practical system enhancements as well as further developments for different applications and target groups.
    07
     
    1月
    The first of a total of three sections will become operational in the autumn of 2017.
    In Edmonton/Alberta, the world´s most advanced oil sand refinery is being constructed on a 2 km² site.
    NWR Edmonton - In addition to the system-related assembly and safety advantages provided by PERI UP, the competent on-site project support in particular is an important factor for realizing time and cost reductions.

    プレスリリース

    High level of safety and increased efficiency in industrial scaffolding

    The PERI UP scaffolding system along with the integration of 3D scaffold planning at an early stage has reduced the time and cost factor while simultaneously increasing safety levels for the construction of an industrial plant in Canada.
    09
     
    12月
    Christian Jakob and André Pöbel, Baden-Wuerttemberg Cooperative State University Mosbach
    The finalists came from universities in Germany and Austria and presented their solutions at the end of November in the PERI training centre in Weissenhorn in front of a large audience and jury of industry experts.

    プレスリリース

    Expert jury determines winners of the 10th PERI student competition

    Through participation in the Construction Exercise, PERI offers educational institutions providing construction-related courses not only the opportunity to gain valuable experience with a specific practical approach but also win attractive cash prizes.
    02
     
    12月
    Earthquake-proof shoring solution for the Stavros Niarchos Foundation Cultural Center building in Athens. Designed by the Architect Renzo Piano.
    Overview of the Stavros Niarchos Foundation Cultural Center construction site with PERI scaffolding and formwork systems.
    Architectural concrete wall built with PERI VARIO GT 24 Girder Wallformwork at the Stavros Niarchos Foundation Cultural Center

    プレスリリース

    Earthquake-proof shoring solution for new iconic structure in Athens

    Not far from the Faliro bay in Athens, the Stavros Niarchos Foundation Cultural Center (SNFCC) is being realized based on a design by star architect, Renzo Piano. PERI is supporting the construction of this extraordinary project with a comprehensive formwork and scaffolding solution which includes continuous on-site supervision along with a matching logistics concept for managing the enormous amount of materials.
    18
     
    11月
    PERI Weather Protection Roof - mounting a girder segment
    PERI protection roof - Lifting of a girder segment with the crane
    The PERI protection roof opened for construction work with the concrete pump

    プレスリリース

    Safe access to weather protection roof – no PPE against falling required

    For the LGS Weather Protection Roof from the extensive PERI product portfolio, a fast and reliable solution for safe working on roof girders is now also available: a walkway along the girder whereby the use of personal protective equipment against falling is no longer required.
    09
     
    11月
    Unusual Scaffolding solution: Cantilevered instead of positioning. New engineered working scaffold solution.
    Scaffolding solution made with PERI VARIOKIT and PERI UP as well as MULTIPROP
    Platforms and Trolley planned by PERI and developed with VARIOKIT and PERI UP.

    プレスリリース

    Cantilevered system combination for refurbishment measures

    Cantilevered platforms have accelerated the complete renovation of a luxury hotel in Luxembourg. The customized project solution was based on two compatible PERI modular construction systems: VARIOKIT and PERI UP.
    05
     
    10月
    PERI project - water retaining structures - Foz Tua Dam, Vila Real – Alijó, Portugal
    PERI project - hydraulic structures - Foz Tua Dam, Vila Real – Alijó, Portugal
    Foz Tua Dam, Vila Real – Alijó, Portugal - PERI project

    プレスリリース

    Elaborate engineering services for an imposing dam

    PERI devised and supplied an optimised and safe formwork and scaffolding solution for construction of the Foz Tua Dam and the associated pumped-storage power station. The PERI specialists supported the construction firm, Barragem de Foz Tua, ACE, to ensure the build was completed on schedule and with precision, providing an elaborate concept, as well as logistical and technical services.
    01
     
    9月
    Overview of the construction site - PERI Project - "Humboldt Forum" City Palace, Berlin
    Facade view - PERI Project - "Humboldt Forum" City Palace, Berlin
    PERI formwork - PERI Project - "Humboldt Forum" City Palace, Berlin

    プレスリリース

    Formwork and scaffolding from one source for Berlin´s City Palace

    For the reconstruction of Berlin´s City Palace, PERI supplied cost-effective formwork and scaffolding solutions from one source. In addition to providing large quantities of wall, column and slab formwork with fast shuttering and moving times as well as flexibly used scaffolding materials, the on-site support provided by the PERI engineers ensured that all requirements could be fulfilled along with maintaining the tight construction schedule.
    11
     
    8月
    Importer of the year 2014 - PERI Ukraine
    PERI Ukraine has been presented with two awards

    プレスリリース

    BEST SUPPLIER and IMPORTER OF THE YEAR Awards for PERI Ukraine

    In recognition of its consistently high level of operational performance throughout 2014, PERI Ukraine has been presented with two awards: BEST SUPPLIER 2014 and IMPORTER OF THE YEAR 2014.
    03
     
    8月
    Barangaroo South, Sydney - The three ITS high-rise towers for the centre of the ambitious Barangaroo South project in the Sydney harbour area.
    Barangaroo South, Sydney - With the Barangaroo Point Reserve (North), Central Barangaroo and Barangeroo South sub-projects, Sydney´s city centre is being expanded westwards by an impressive 22 hectares. In the foreground is the three ITS high-rise towers are rising steadily upwards; in the background is the famous Sydney Opera House with its distinctive roof structure.
    Barangaroo South, Sydney - Over 700 linaer metres of PERI LPS enclosure secure and accelerate construction work on the three high-rise towers - up to the final height of 217 m.

    プレスリリース

    Construction time optimisation through comprehensive working safety and crane-independent climbing

    The new LPS climbing protection panel from PERI provides comprehensive working safety and saves valuable crane time thanks to the mobile climbing hydraulics. This has accelerated construction progress on the International Towers Sydney complex on Australia's east coast.
    14
     
    7月
    PERI Press Release: Completion now within reach: flooding of a canal section Expansion of the Panama Canal

    プレスリリース

    Completion now within reach: flooding of a canal section

    With the flooding of a canal section in June 2015, tests have begun in readiness for the scheduled opening of the expansion project in 10 months time. Since 2011, PERI has delivered around 1,100 containers of formwork and scaffolding materials to Panama. Once again, the company has demonstrated its superb service capabilities as well as ability to deliver – in this particular case through the excellent teamwork of several subsidiaries.
    06
     
    7月
    Lascaux IV - Centre International d’Art Pariétal (CIAP): Overall view of the museum complex. Through the TRIO panel formwork, the high requirements on the concrete surfaces have been fully met.
    Lascaux IV - Centre International d’Art Pariétal (CIAP): With customized VARIO GT 24 girder wall formwork, those areas featuring two counter-positioned inclinations can easily be aligned.
    Lascaux IV - Centre International d’Art Pariétal (CIAP): The TRIO panel formwork allows the construction of the 13.50 m high walls with variable inclinations. Up to 14 m long RS push-pull props ensure the correct alignment of the elements.

    プレスリリース

    Replica of a cave from the Paleolithic Age realised in the original form with PERI

    The museum complex is dedicated to showcasing cave paintings with the central feature being a complete replica of the "Lascaux 4" cave. PERI has supported the project by providing an overall concept comprised of detailed technical preparation, absolute safe formwork solution and continuous consultation.
    16
     
    6月
    PERI press release - special formwork
    PERI press release - special formwork
    PERI press release - special formwork

    プレスリリース

    Formwork in every shape and dimension – even faster with the new CNC system

    PERI is keeping pace with this trend: with individual formwork solutions, the formwork and scaffold expert ensures that complicated designs become reality. In order to increase the required capacity at the Weissenhorn formwork assembly plant, a second state-of-the-art CNC timber processing facility started operations in the spring of 2014.
    16
     
    6月
    PERI press release - PERI accompanies the construction sector for Industry 4.0 integration - 5D Conference, Konstanz, Germany
    PERI press release - PERI accompanies the construction sector for Industry 4.0 integration - 5D Conference, Konstanz, Germany
    PERI press release - PERI accompanies the construction sector for Industry 4.0 integration - 5D Conference, Konstanz, Germany

    プレスリリース

    PERI accompanies the construction sector for Industry 4.0 integration

    PERI and other companies in the construction industry are becoming increasingly involved with the issue of "Building Information Modelling" (BIM), the all-embracing project planning in five dimensions. At the third 5D conference in Konstanz, Germany, the trend towards BIM was adopted and welcomed as the new standard.
    01
     
    6月
    Viaduct Krakow-Płaszow Railway Junction - Customized solution through the flexible and modular adaptability of the system.
    Viaduct Krakow-Płaszow Railway Junction - The safety was guaranteed through the compatibility with the PERI UP modular scaffolding.
    Viaduct Krakow-Płaszow Railway Junction - Construction of the 252 m long crossing over the Krakow-Plaszow railway junction was carried out using 4 VARIOKIT cantilevered construction carriages.

    プレスリリース

    Cost-effective cable stay bridge construction with VARIOKIT balanced cantilever equipment

    The current expansion of the Krakow metropolitan railway network (KST) requires, among other things, crossing of the Krakow-Plaszow railway junction. Ensuring that daily rail operations remained unaffected during the construction of the 252 m long crossing was a prerequisite which meant the general contractor decided in favour of the cantilevered construction method for realizing the extradosed bridge with its hollow box cross-section.
    05
     
    5月
    Within a 2-3 year period, a total of 86,400 flights are simulated which is three times the expected service life. The PERI UP working scaffold allows test preparations as well as continuous measurement and inspection work to be carried out during the EF-2 testing phase.
    PERI provided the scaffolding solution for the second endurance test.
    Ideal system combination: PERI UP, RCS climbing rails, VARIOKIT engineering construction kit

    プレスリリース

    Modular, combinable, adaptable: Testing for Take-Off with PERI UP

    As an essential prerequisite for the approval of the Airbus A350 XWB, the IABG Industrieanlagen-Betriebsgesellschaft mbH has carried out an extensive range of tests on the new wide-bodied aircraft at its testing facility in Erding. With the scaffolding solution from PERI, optimal adaptation of the working levels for the fuselage and wings was achieved.
    16
     
    4月
    PERI press release - Competent handling of renovation work with project-specific solutions - Formwork and scaffolding technology for existing buildings
    PERI press release - Competent handling of renovation work with project-specific solutions - Formwork and scaffolding technology for existing buildings
    PERI press release - Competent handling of renovation work with project-specific solutions - Formwork and scaffolding technology for existing buildings

    プレスリリース

    Competent handling of renovation work with project-specific solutions

    Construction work on existing buildings frequently places high demands on clients, planners and building contractors. The entire planning procedure as well as the equipment to be used must be adapted to match the project-specific characteristics of the structure and, in particular, the constructional environment. With a wide range of products and their sophisticated use, PERI succeeds in finding the most suitable and cost-effective solution for each of the upcoming tasks.
    01
     
    4月
    JKG Tower, Jalan Raja Laut, Kuala Lumpur - A complete solution consisting of formwork, scaffolding and related services has guaranteed safety at all heights and rapid progress during the construction of JKG Tower complex.
    JKG Tower, Jalan Raja Laut, Kuala Lumpur - For the top 3 floors in each case, the RCS P climbing protection panel offers all-round anti-fall protection. In addition, it is used as advertising space.JKG Tower, Jalan Raja Laut, Kuala Lumpur
    JKG Tower, Jalan Raja Laut, Kuala Lumpur - The RCS landing platform is integrated in the climbing formwork solution. Loads are temporarily stored on the landing platform as well as being moved from here into the other storeys.

    プレスリリース

    Working faster due to safer conditions

    For the construction of the JKG Tower high-rise building complex – consisting of a 32-storey office tower along with a 13-storey parking facility – safety has been given the highest priority. As a result, the PERI formwork and shoring solution has also included, among other things, a corresponding training programme for the construction team.
    25
     
    3月
    Leonhard Braig will be responsible for the areas of product management, product technology, development, procurement, production and logistics.

    プレスリリース

    Leonhard Braig appointed Managing Director at PERI

    Weissenhorn, 25 March 2015. Leonhard Braig (46) has been named Head of Products & Technology at PERI GmbH effective as of mid-April 2015. He will be responsible for the areas of product management, product technology, development, procurement, production and logistics.
    03
     
    3月
    Metro extension, Algiers - The Algerian metro station "Place des Martyrs" is 144 m long and features record-breaking dimensions with its 23 m width and 14.80 m height.
    Metro extension, Algiers - Based on the VARIOKIT modular system, the PERI formwork carriage solution is tailored to meet all project requirements and is also hydraulically operated.
    Metro extension, Algiers - Shuttering and stripping is done hydraulically on the VARIOKIT tunnel formwork carriage. It is also based on rentable system components and can be rapidly assembled and adapted by means of standardized bolted connections.

    プレスリリース

    Tunnel formwork with record-breaking dimensions

    With a length of 144 m and a width approaching 23 m, the "Place de Martyrs" metro station boasts some very impressive dimensions. In addition, the entire 1.7 km long extension of the Algiers metro system runs under historic ground. For this project, an international team of PERI engineers designed economically optimized tunnel formwork solutions, tailored to meet the varying requirements.
    03
     
    2月
    Pegasus Sculpture, USA - The 33 m high and 60 m long sculpture ensemble, featuring Pegasus and a dragon, was realised in a larger than life size. With the help of the PERI UP solution, more than 1,000 bronze castings could be assembled and welded on site.
    Pegasus Sculpture, USA - The PERI UP Rosett Flex modular scaffold system provided safe working conditions for the craftsmen and metal designers during the realisation of the 33 m high bronze work of art.
    Pegasus Sculpture, USA - PERI UP was flexibly adapted to suit the organic shape of the bronze sculpture in 25 cm increments and thus provided optimum conditions for all necessary operational steps: adjustment, welding, processing, chasing and patinating.

    プレスリリース

    Super-sized bronze casting: 3D-puzzle on PERI UP scaffolding

    For the erection of the extraordinary Pegasus bronze sculpture in Miami/Florida, PERI UP Rosett Flex provided optimal working conditions. The modular scaffold system proved once again just how flexible and versatile it is, adapting to the complex geometry in 25 cm increments.
    20
     
    1月
    PERI press release - PERI India won the EPC World Media, Ernst & Young and Zee Business Group Award 2014 - Honoured for excellence in India Infrastructure and Construction Industry

    プレスリリース

    PERI India won the EPC World Media, Ernst & Young and Zee Business Group Award 2014

    PERI India has been honoured with the EPC World, Ernst & Young and Zee Business Group Awards 2014 being an “Outstanding Company in Formwork and Scaffolding Sector”. The award was handed over on 18th of December 2014 in New Delhi.
    01
     
    1月
    Mausoleum Michniów - The museum shape symbolizes a traditional village hut, which gradually crumbles into dust. Numerous offsets and inclined surfaces characterize the complex structure. PERI engineers developed a customized formwork concept in order to carry out the project with a minimum quantity of special formwork.
    Mausoleum Michniów - MULTIPROP towers and rentable VARIOKIT system components form the up to 14.75 m high shoring.
    Mausoleum Michniów - The tilting walls are formed using TRIO large sized elements – supported by diagonal bracing.

    プレスリリース

    Complex architecture primarily achieved with system formwork

    In Poland, the mausoleum commemorating a mass murder of the entire village of Michniów and other Polish villages across the occupied country during the World War 2 is currently being constructed. The museum features a traditional village hut which gradually falls apart. Numerous offsets and inclined surfaces characterize the structure as well as the distinctive timber-like finish on concrete surfaces.
    02
     
    12月
    Mur Bridge Frohnleiten - For the construction of the Mur Bridge near Frohnleiten, the new VARIOKIT heavy-duty truss from PERI has set new standards in shoring operations.
    Mur Bridge Frohnleiten - For transferring the heavy loads over the almost 40 m span, the truss arrangement and spacings can be flexibly determined using a metric grid configuration.
    Mur Bridge Frohnleiten - Modular shoring assembly: VARIOKIT system components were pre-assembled on the ground to form truss segments and placed into intermediate storage with the crane. Three such segments were subsequently coupled to create a 37 m long truss unit and lifted over the Mur by means of a mobile crane.

    プレスリリース

    Large-spanned trusses with high load-bearing capacity and low deadweight

    For construction of the Mur Bridge, the new PERI VARIOKIT lattice girder system is being used for the first time in Austria. This is characterized by its extremely high load-bearing capacity with a comparably low weight; in addition, the system components can be quickly installed and have a very flexible use.
    10
     
    11月
    PERI press release - PERI and PyraTec sign cooperation agreement

    プレスリリース

    Full-face surface repair for PERI Pave production pallets

    After successful tests had been carried out with PERI Pave recently, PERI decided to cooperate closely with PyraTec in future: as a result, the specialist company will now take on the sustainable renovation of PERI production pallets with immediate effect – whilst taking into account the high PERI quality standards.
    04
     
    11月
    Museum of Tomorrow, Rio de Janeiro - For realising the extraordinary museum on time and within budget, PERI planned, produced and delivered over 3,500 customised special formwork elements.
    Museum of Tomorrow, Rio de Janeiro - The "Museum of Tomorrow“ was designed by Santiago Calatrava and extends 300 m into the sea on a pier.
    Museum of Tomorrow, Rio de Janeiro - Supported by PERI UP shoring and working scaffolds, as well as VARIOKIT raised formwork units, the customised elements are assembled on site to form a complete 3D formwork construction.

    プレスリリース

    Trend-setting forming

    A customized PERI formwork and scaffolding solution with 3,500 project-specific special formwork elements ensured that the realization of an extraordinary museum was carried out within the specified time-frame and budget.
    01
     
    10月
    The 3rd Bosphorus Bridge has the highest concrete bridge piers in the world, and will eventually connect the European and Asian continents after its completion in 2015.
    3rd Bosphorus Bridge, Istanbul, Turkey - The PERI ACS climbing formwork is easily adapted from cycle to cycle to match the tapered pier layouts.
    3rd Bosphorus Bridge, Istanbul, Turkey - The complete solution from PERI meets the strict requirements regarding high flexibility and dimensional accuracy.

    プレスリリース

    Highest concrete bridge pier in the world with PERI ACS self-climbing formwork

    In the north of the Turkish metropolis, the third and largest bridge is currently being built across the Bosphorus. The suspension bridge is supported by two A-shaped pylons and reaches a height of around 330 m thus making it one of the highest in the world. The construction of the upper area of the two piers is being carried out in 21 concreting sections, each 4.60 m.
    11
     
    9月
    PERI press release - Apps and Tools

    プレスリリース

    PERI Apps make construction site operations easier

    PERI has developed resp. updated three of its helpful apps for formwork and scaffolding: Formwork Load Calculator, MULTIFLEX Configurator and ST 100 Stacking Tower Configurator are now available on the website featuring an extensive range of benefits.
    01
     
    9月
    UTEC University Campus, Lima, Peru - With the help of the customized PERI formwork and scaffolding solution, a new campus complex is being realized in Lima – with high architectural requirements and a tight construction schedule.
    UTEC University Campus, Lima, Peru - The loads resulting from the parapets, beams and slabs are reliably transferred by means of PERI UP Rosett shoring, also over the distance of several storeys.
    UTEC University Campus, Lima, Peru - Flexible in three dimensions: the 25 cm modular grid of the PERI UP system allows optimum adaptability to suit the wide range of geometries and loads.

    プレスリリース

    Grandstand-style campus realized in a short construction period

    With the help of a customized PERI formwork and scaffolding solution, a new university campus is being constructed in the capital of the South American country of Peru – complete with high architectural requirements as well as having to maintain a short construction period.
    01
     
    8月
    Warsaw Spire - With a height of 220 m, the new office tower of the "Warsaw Spire" building ensemble will be the tallest office building in Warsaw after completion. Two office buildings flank the tower, each 55 m high.
    Warsaw Spire - The optimally adapted PERI climbing formwork solution for the core of the building has ensured a weekly cycle for the floors. The shell enclosing the RCS climbing protection panel is completely enclosed and has provided safe working conditions at all heights and in all weathers for the construction of the shell.
    Warsaw Spire - With the customized VARIO GT 24 girder formwork, the construction team achieved the required, high‑quality surfaces of partly elliptical core walls.

    プレスリリース

    Quickly and safely to the top with optimally adapted climbing technology

    In Warsaw, the Warsaw Spire office complex is currently being constructed. The 220 m high, waist‑like office tower complete with elliptical ground plan characterizes the appearance of the building ensemble; the tower is flanked by a 55 m high building on each side. PERI has planned and supplied the complete formwork and scaffolding solution for the complex.
    01
     
    7月
    Capitol Hill Station, Seattle, USA - The VARIOKIT formwork carriage and HD 200 heavy-duty props were used for the construction of the new subway station in Seattle.
    Capitol Hill Station, Seattle, USA - PERI formwork carriage solution ensures savings on assembly time and expense.
    Capitol Hill Station, Seattle, USA - PERI TRIO, VARIO GT 24, SB Brace Frame, MULTIFLEX, MULTIPROP and PERI UP formwork and scaffold systems supplemented the comprehensive project solution.

    プレスリリース

    System-based project solution saves time and money

    The formwork and scaffolding solution provided for the construction of the new subway station in Seattle was the result of competent engineering and a project-specific construction kit system. In addition to the widest possible use of rentable PERI system components, the optimized construction method in particular ensured significant time and cost savings.
    30
     
    6月
    PERI press release - Family Business Career Day
    PERI press release - Family Business Career Day
    PERI press release - Family Business Career Day

    プレスリリース

    Family businesses offer international career opportunities

    By arranging the Family Business Career Day we want, therefore, to inform candidates about the opportunities in our company and especially about potential positions around the world.
    03
     
    6月
    Stanari Thermal Power Station, Doboj, Bosnia-Herzegovina - A total of 9 circular piers with 3.60 m diameters and 40 cm wall thicknesses will subsequently carry a steel platform for the condenser.
    Stanari Thermal Power Station, Doboj, Bosnia-Herzegovina - The circular‑shaped piers steadily extend upwards by means of the CB 240 climbing formwork and VARIO GT 24 formwork elements to a height of around 26 m. The units, consisting of formwork and scaffolding, can be quickly moved by crane to the next concreting cycle. The PERI UP Alu 64 stairs provide safe and secure access to the working areas.
    Stanari Thermal Power Station, Doboj, Bosnia-Herzegovina - The PERI UP modular scaffolding forms the shoring for up to 5.30 m high slab in the turbine building. The legs are simply bundled together in areas of high load concentrations – the system can therefore be optimally adapted to suit the loads.

    プレスリリース

    Test of strength for PERI formwork and scaffolding

    The Energy Financing Team (EFT) is currently constructing the Stanari coal powered power plant near Doboj. PERI supplies two of the building contractors involved with a customized formwork and scaffolding solution. In addition to the materials, it is the technical preparation done by PERI engineers that provides extremely helpful support thus ensuring efficient project execution.
    05
     
    5月
    Munich Airport Satellite Terminal, Germany - The 600 m long, new satellite terminal at Munich airport is located in the centre of the airfield and encloses the apron tower and incorporates the existing baggage sorting centre. Construction is taking place during normal airport operations and presents an enormous challenge to all those involved in the project.
    Munich Airport Satellite Terminal, Germany - More than 4,500 MULTIPROP slab props carry the steel construction until, together with the hardened concrete, it is able to support independently. The up to 6.25 m extendable props only weigh 35 kg and can easily be moved by hand.
    Munich Airport Satellite Terminal, Germany - The PERI solution for the huge construction site includes a comprehensive package of services: the supply of large quantities of materials, flexible engineering, tailored logistical operations as well as on-site support through the PERI project manager. The complete package provides all parties involved with real added value – for the contractor as well as the scaffolders.

    プレスリリース

    Comprehensive range of services for construction and scaffolding companies

    In order to be able to handle around 11 million additional passengers per year from 2015 onwards, Terminal 2 at Munich Airport is currently being expanded in the form of a satellite terminal. PERI has supplied a complete solution consisting of formwork, scaffolding and engineering – and convinced both the construction company and the scaffolding contractor with its safer and faster system technology as well as a customized package of services.
    28
     
    4月
    PERI press release - Seal of approval: Recognizing an ecological manufacturer - PEFC und FSC certifications for plywood
    PERI press release - Certifications for PERI plywood

    プレスリリース

    Seal of approval: Recognizing an ecological manufacturer

    A positive example for ecological and sustainable developments is the formwork and scaffolding manufacturer PERI, whose material for its plywood sheets originates from sustainable forests. The forest areas where the raw materials come from are reforested after every harvest – this is verified through the PEFC and FSC certifications.
    22
     
    4月
    Certificate for the award as most innovative product in show
    myPERI offers an efficient information management system for PERI jobsites.

    プレスリリース

    World Wide Success: myPERI wins award in Great Britain

    Keeping an eye on all information concerning formwork and scaffolding materials on construction sites around the clock – this is something that has been available in Germany since February 2012 with myPERI. After successfully completing a series of test runs, the English version has been integrated into the range of services offered by the PERI subsidiary, and promptly received the award for "Most Innovative Product in Show" at the UK CONCRETE Show.
    03
     
    4月
    ISET Tower, Yekaterinburg, Russia - The ISET Tower in Yekaterinburg is characterized by its external shape. PERI planned a comprehensive, crane-independent concept of the climbing formwork required on the elevator shafts and core walls, as well as the climbing protection panel on the building´s outer edges.
    ISET Tower, Yekaterinburg, Russia - With the RCS rail climbing system, the external formwork safely climbs the circular building core from storey to storey using a rail-guded procedure. Level +1 is completely enclosed which guarantees efficient formworking operations and reinforcement work.
    ISET Tower, Yekaterinburg, Russia - The elevator shafts are arranged in the centre of the building´s core. Due to the restricted dimensions, self-climbing ACS S shaft formwork is being used for these walls.

    プレスリリース

    Project-specific climbing solution with practical adaptation

    A customized PERI climbing formwork solution has been supporting the rapid construction progress on the ISET Tower in Yekaterinburg. The formwork concept has taken into account the high wind loads as well as the variable number of elevator shafts with varying dimensions.
    01
     
    4月
    Dr. Fabian Kracht is the managing director for Finance and Organization at PERI GmbH.

    プレスリリース

    Fabian Kracht new managing director at PERI

    From April 1, 2014 on, Dr. Fabian Kracht (35) will be the new managing director for Finance and Organization at PERI GmbH, one of the global market leaders for formwork and scaffolding.
    03
     
    3月
    Marchlehner Gallery, Sölden, Austria - The VARIOKIT tunnel formwork solution accelerated construction of the 228 m long Marchlehner gallery situated at a height of 1,800 m above sea level. The competent planning process took into account al possible project requirements which ensured on-schedule completion before the onset of winter.
    Marchlehner Gallery, Sölden, Austria - The PERI formwork concept consisted of a 13.50 m long slab formwork carriage with a 3.00 m width – the 4.50 m high drive-through height provided easy access for construction site vehicles as well as transit traffic.
    Marchlehner Gallery, Sölden, Austria - A transverse launching unit integrated in the lifting unit ensured problem-free alignment of the formwork carriage to match the changing radii.

    プレスリリース

    Customized tunnel formwork carriage allows both construction and utilization

    A VARIOKIT tunnel formwork solution accelerated construction progress for the 228 m long Marchlehner gallery, situated at a height of 1,800 m above sea level. The competent planning took into account all possible project requirements which ensured on-schedule completion before the onset of winter.
    05
     
    2月
    Midfield Terminal Building, Abu Dhabi - The Midfield Terminal Complex is the ultimate in construction sites.
    Midfield Terminal Building, Abu Dhabi - Over 6,000 PD 8 slab tables are in continuous use which is the equivalent to an area of almost 10 football pitches.
    Midfield Terminal Building, Abu Dhabi - The massive beams are being constructed in one pour together with the slabs.

    プレスリリース

    Over 6,000 slab tables in continuous use at the Midfield Terminal project

    PERI has provided yet another convincing performance with the construction of the Midfield Terminal at Abu Dhabi International Airport with the delivery of enormous amounts of materials at short notice as well as competent engineering for the related formwork and scaffolding planning.
    07
     
    1月
    Smithland Hydroelectric Power Plant - The Smithland hydroelectric power plant is equipped with 3 turbines; due to the extremely tight construction schedule, all three tubes with their constantly changing cross-sections are being realized at the same time.
    Smithland Hydroelectric Power Plant - For the construction of the concrete tubes, PERI planned and assembled multi-curved formwork units. The final assembly of the formwork and shoring construction is carried out on site.
    Smithland Hydroelectric Power Plant - The fully assembled units comprising of formwork units and raised formwork are lifted by crane into the concreting position.

    プレスリリース

    From the planning to implementation – comprehensive engineering services for construction of the power plant shell

    For the Smithland hydropower station, PERI provides a customized formwork and shoring solution. The extremely tight construction schedule, massive structural elements and in part multi-curved surfaces required a huge number of specially-made 3D formwork units in addition to large quantities of system equipment.
    05
     
    12月
    With PERI MAXIMO, the latest edition on panel formwork contains for the first time a system with one-sided tie technology – which has been proven to save up to 50 % on workload.
    PERI press release - Documented efficiency: shuttering times reduced by 50 % with Maximo - New working time reference values for panel formwork
    PERI - press release - New working time reference values for panel formwork

    プレスリリース

    Documented efficiency: shuttering times reduced by 50 % with Maximo

    The reference times featured in the "Arbeitsorganisation Bau" handbook are a valuable basis for construction site calculations in Germany. With Maximo, the latest edition on panel formwork contains for the first time a system with one-sided tie technology – which has been proven to save up to 50 % on workload.
    02
     
    12月
    Motorway bridge over the Drava, Osijek, Croatia - A VARIOKIT cantilevered parapet carriage serves for constructing the external cantilevered parapets.
    Motorway bridge over the Drava, Osijek, Croatia - The precast beams of the foreland bridges are supported on 180 cm thick circular columns complete with mushroom shaped heads.
    Motorway bridge over the Drava, Osijek, Croatia - The internal cantilevered parapets are formed by a movable solution of a construction of VARIOKIT and PERI Up system components.

    プレスリリース

    Formwork solution for pylons and bridge superstructure from one source

    The bridge over the Drava river is part of the realization of the 90 km long A5 motorway development in eastern Croatia. Peri planned and delivered not only a cost-effective climbing formwork solution for the construction of the up to 75 m high bridge pylons, but also the concept for the creation of the piers and the parapet solution for the foreshore bridges.
    25
     
    11月
    For the tenth time, Peri is offering all educational and training institutions involved in the field of construction the opportunity of participating in its well known Construction Exercise.
    For the tenth time, Peri is offering all educational and training institutions involved in the field of construction the opportunity of participating in its well known Construction Exercise.

    プレスリリース

    International competition with high requirements and a long tradition

    For the tenth time, Peri is offering all educational and training institutions involved in the field of construction the opportunity of participating in its well known Construction Exercise. The competition not only provides valuable experience with a specific practical application but also the chance to win attractive cash prizes. Winners of the 9th competition were recently awarded – and thoughts have already turned to the next competition.
    04
     
    11月
    Eemshaven Power Plant, Netherlands - For the power plant construction in Eemshaven, the industrial scaffold system PERI UP has clearly demonstrated its flexibility and adaptability.
    Eemshaven Power Plant, Netherlands - Working platforms and integrated access means for the welding and insulation operations on the two electric filters for the flue gas desulphurisation are based on the PERI UP Rosett Flex modular scaffolding system.
    Eemshaven Power Plant, Netherlands - For the spatial scaffolding of the filter funnel, the metric grid system of the PERI UP scaffolding system which allows the bay widths to be divided as required is a particular advantage.

    プレスリリース

    High level of working safety for scaffold assembly and use

    As part of the planned construction of the new power plant, the Peri Up Rosett Flex has proved to be extremely adaptable during the assembly phase – in so doing, it has fulfilled the highest requirements regarding the installation of the working platforms. The fact that the modular scaffolding can be assembled with the guardrail in advance means that the safety level required during scaffold erection is already guaranteed to a high degree.
    10
     
    10月
    Recognized as an outstanding innovation: the Peri Up Shoring Tower MDS
    Recognized as an outstanding innovation: the Peri Up Shoring Tower MDS

    プレスリリース

    Recognized as an outstanding innovation: the Peri Up Shoring Tower MDS

    At the Préventica in Lyon – a trade fair which focuses on all aspects relating to occupational safety – a jury awarded the Peri Up Shoring Tower MDS the innovation prize in the category "Working at Heights". The shoring tower is characterized by the fact that a totally safe erection procedure is fully integrated throughout.
    01
     
    10月
    Hotel Mélia, La Défense, Paris, France - For the construction of the Hotel Meliá in the "La Défense" office district, PERI developed a comprehensive climbing formwork solution. This serves not only as an enclosure, which ensures the safety of the construction teams at all times, but also it supports the precast parapets during erection.
    Hotel Mélia, La Défense, Paris, France - The 2,00 m high mesh barriers from the PROKIT safety system are also clad with sheeting thus creating a gap free enclosure.
    Hotel Mélia, La Défense, Paris, France - The climbing rails are held in position on the parapets of the basement levels and additionally fixed to the slab.

    プレスリリース

    Made-to-measure climbing formwork solution – all-round enclosure and formwork scaffold

    For the Hotel Mélia in the "La Defense" office district just outside Paris, Peri has developed a climbing formwork solution that not only provides complete enclosure of the structure but also serves as erection support for the precast parapets.
    13
     
    9月
    PERI was founded in January 1969. At first, there was only one engineer‘s office but, in April 1969, work had already begun on the building of a small production hall on a plot of land on the outskirts of Weissenhorn. Since then the PERI areal has been continuously expanded and extended.

    プレスリリース

    Group Management at PERI will be extended

    PERI, global market leader for formwork and scaffolding with a turnover of 1.052 billion Euros in 2012 and 6,600 employees worldwide, is going to extend its Group Management.
    02
     
    9月
    Lanaye Lock Bridge, Belgium - In the complex area with an extremely tight outer radius, the concentrated loads of the radially-arranged cantilever brackets are transferred into the available bridge piers by means of pressure supports.
    Lanaye Lock Bridge, Belgium - The expansion of the Lanaye lock facility required the new construction of a 200 m long road bridge.
    Lanaye Lock Bridge, Belgium - The VARIOKIT steel composite formwork carriage could be adapted to match the geometrical and static requirements which included 4.50 m cantilevers.

    プレスリリース

    Individual project solution with construction kit system

    The Variokit modular construction system is being used for the cost-effective realization of the steel composite bridge over the extended Lanaye lock facility in Belgium. Based on standardized, rentable system components, Belgian and German PERI engineers adapted the bridge solution to match the range of construction site requirements.
    05
     
    8月
    Nordhavnsvej Tunnel - The formwork carriage has been designed so that trucks can pass through at any time without obstacles. Due to the cramped site conditions, an absolutely essential requirement for the execution.
    Nordhavnsvej Tunnel - The slab formwork carriage for the Nordhavnsvej tunnel project consists almost entirely of system components from the Variokit engineering construction kit – and is therefore extremely cost-effective.
    Nordhavnsvej Tunnel - Everything from one source: PERI has provided a comprehensive solution. Through the mounted Alu 75 site staircase and Prokit EP 110 side protection, safe conditions have also been created for the construction team when using the access points as well as carrying out slab formwork activities.

    プレスリリース

    Customized formwork and scaffolding solution from one source

    Around 620 m of the extensive Nordhavnsvej infrastructure project runs underground. The twin-tubed, rectangular tunnel is being realized using the cut-and-cover method – the walls with Trio panelized formwork in advance followed by the slab formed with the Variokit tunnel formwork carriage. With the customized project solution, the construction team has achieved a three week cycle for the 25 m long concreting sections.
    01
     
    7月
    North Station Vienna - The use of efficient formwork systems for the walls and slabs ensured that the very tight completion deadline for the building shell could be met.
    North Station Vienna - On the area that was formerly Vienna´s North Station, 91 housing units are currently being developed in two eight-storey residential buildings.
    North Station Vienna - The one-sided tie installation procedure of the MAXIMO panel formwork reduced shuttering times as well as ensuring that a neat joint and tie arrangement was achieved.

    プレスリリース

    Construction time savings with MAXIMO and SKYDECK

    On the former North Station area, the "Schwarzatal" non-profit real estate developer is currently realizing a very special housing project. The use of modern and efficient formwork systems for the walls and slabs ensured that the very tight completion deadline of only 10 months for the building shell could be met.
    07
     
    6月
    PERI press release - Apps and Tools

    プレスリリース

    Digital solutions with added value

    At bauma 2013, PERI presented a number of new digital innovations which included the launch of the PERI handbook as an application for mobile devices. In addition, the company unveiled applications for determining the concreting speed as well as a configurator for the MULTIFLEX slab formwork designed for use on smart phones and tablets.
    05
     
    6月
    PERI UP at the Skyscraper Festival
    PERI UP at the Skyscraper Festival
    Free-standing stairway with a height of 15 m realized on the basis of the PERI UP Rosett Flex modular scaffold

    プレスリリース

    A hugely impressive appearance - PERI UP at the Skyscraper Festival

    In May 2013, the fifth Skyscraper Festival in Frankfurt am Main took place. 18 high-rise buildings opened their doors to the general public and countless other programme highlights thrilled and entertained more than a million visitors.
    03
     
    6月
    Grain Silo near Parma, Italy - Cost-effective PERI climbing concept: with a complete platform level and halved on-site wall formwork requirements, fast and continuous working operations were achieved.
    Grain Silo near Parma, Italy - Type-tested and a high level of safety in all operational areas: PERI CB 240 and CB 160 climbing scaffold systems on the inside and outside respectively.
    Grain Silo near Parma, Italy - Optimal jobsite results: PERI climbing formwork solution with CB climbing platforms and accurately rounded VARIO GT 24 wall formwork.

    プレスリリース

    High quality in continuous 2-week cycles

    Using a PERI climbing formwork solution precisely tailored to meet the project requirements and reduced material requirements, nine silos grew steadily upwards in regular 2-week cycles. Ready-to-use elements supplied directly from the PERI formwork assembly hall ensured dimensional stability.
    03
     
    5月
    PERI press release - Increased profitability for VARIOKIT tunnel formwork carriage - PERI civil engineering solutions at bauma 2013
    PERI press release - PERI civil engineering solutions at bauma 2013
    PERI press release - PERI civil engineering solutions at bauma 2013

    プレスリリース

    Increased profitability for VARIOKIT tunnel formwork carriage

    At this year's bauma, PERI presented new system components and a wide range of further developments for formwork and scaffolding technology. Also the tunnel formwork carriage exhibited at the fair is characterized by detail improvements that have been designed to increase the cost-effectiveness and accelerate the assembly.
    03
     
    5月
    PERI press release - PERI UP Scaffold Technology at bauma 2013
    PERI press release - PERI UP Scaffold Technology at bauma 2013
    PERI press release - PERI UP Scaffold Technology at bauma 2013

    プレスリリース

    Innovative technology, comprehensive solutions and customer-oriented presentations

    The complete range of scaffolding applications was presented along with new system components and numerous further developments. The exhibition offered prospective customers the best opportunity to learn more about the proven and innovative technology as well as PERI services in greater detail. The entire week of the fair in Munich was characterized by an extremely positive feedback from the industry.
    02
     
    5月
    PERI press release - PERI at bauma 2013
    PERI press release - PERI at bauma 2013
    PERI press release - PERI at bauma 2013

    プレスリリース

    Impressive performance with extremely positive feedback at the world´s biggest fair

    More than 530,000 visitors from over 200 countries attended bauma 2013. Every third visitor to the fair visited the purpose-built PERI exhibition hall which was located on the Open-Air Area North. On over 4,000 square metres, the Weissenhorn-based company presented proven formwork and scaffolding systems as well as numerous innovations.
    23
     
    4月
    The MAXIMO with the one-sided installed tie technology continued to be the centre of attention of the wall formwork.

    プレスリリース

    Innovative technology, comprehensive solutions and customer-oriented presentations at bauma 2013

    At this year´s bauma, PERI presented a number of new formwork and scaffolding systems as well as a wide range of further developments. On an area of over 4,000 m², the exhibition offered visitors the opportunity to learn more about proven and innovative technology at first hand.
    15
     
    4月
    Banco de la Ciudad de Buenos Aires - A standardized construction kit system as well as the planning and delivery of formwork and scaffolding from a single source makes the PERI project solution very cost-effective.
    Banco de la Ciudad de Buenos Aires - Rentable VARIOKIT and MULTIPROP system components form the site-compliant basis for the movable, form-giving slab tables.
    Banco de la Ciudad de Buenos Aires - Due to the metric basic grid dimensions, the PERI UP Rosett Flex scaffolding sub-structure could be optimally adapted to suit the different contact areas.

    プレスリリース

    Undulating roof construction efficiently formed

    An undulating roof structure is being formed by means of longitudinally movable slab tables at a height of 20 m. The project solution developed by PERI´s Argentine engineers fulfils the high architectural concrete requirements as well as maintaining the short construction period from an economic point of view.
    04
     
    3月
    Evolution Tower, Moscow, Russia - Inclined and crane-independently climbed RCS protection panel units provide here a very high level of safety.
    Evolution Tower Moskau - The Evolution Tower is also known as the “City Palace Tower” or the “Wedding Palace”.
    Evolution Tower, Moscow, Russia - VARIO girder wall formwork for the core walls climbed with help of the ACS self-climbing system in regular weekly cycles with 4.30 m concreting cycle heights.

    プレスリリース

    Twisted floors in weekly cycles

    Every week, Moscow´s new landmark is gaining 4.30 m in height – with each completed floor twisted 3° in relation to the preceding one. For this, PERI engineers developed a crane-independent formwork concept on the basis of the RCS and ACS self-climbing technology.
    04
     
    2月
    Hongkong-Zhuhai-Macao Bridge (HZMB), China - The 180 m long tunnel elements are cast in eight individual segments each 22.50 m long – monolithic, without ties and in compliance with strict dimensional tolerances.
    Hongkong-Zhuhai-Macao Bridge (HZMB), China - The internal formwork moves hydraulically over the launching beam into the reinforcement cages.
    Hongkong-Zhuhai-Macao Bridge (HZMB), China - A total of 33 tunnel elements will be produced using two production lines: each 180 m long, 38 m wide, 11.40 m high and weighing 72,000 t.

    プレスリリース

    Incremental launching forming machine for the world´s longest underwater tunnel

    With the help of PERI know-how, the longest underwater tunnel in the world is currently under construction in China. Two hydraulically-operated shuttering machines are being used for the efficient realization of 33 tunnel elements by means of the incremental launching method. Each standard element is an incredible 180 m long and weighs over 70,000 t.
    16
     
    1月
    PERI press release - PROKIT safety system
    PERI press release - PROKIT side mesh barriers
    PERI press release - PROKIT safety system

    プレスリリース

    Construction-compliant accessories for the PROKIT safety system

    For the PROKIT EP 110 safety system, additional system components are now available: a pallet which greatly facilitates logistics operations for the side mesh barrier as well as a plastic screw-on sleeve that is used for easy mounting of the slab feet.
    07
     
    1月
    The CaixaForum in Zaragoza resembles a sculpture and serves as a cultural meeting place.
    The angular arranged shear walls are up to 37 metres high and are obliquely-cut in part in the bottom third of the structure.
    PERI CB 240 framework brackets are connected with TRIO panel formwork to form large-sized climbing formwork units.

    プレスリリース

    Perfectly combined systems: safety and quality during the entire construction

    Ideally combined systems form the basis for efficient and cost-effective construction work. With this very much in mind, PERI engineers tailored their formwork and scaffolding solution to precisely match the project requirements for the construction of the sculpture-like "CaixaForum".