TrIIIple, Vienna, Austria

プロジェクト情報

ロケーション: Vienna, オーストリア

  • Building height:
    • Building height tower 1: 120 m / 33 upper floors
    • Building height tower 2: 110 m / 30 upper floors
    • Building height tower 3: 123 m / 34 upper floors
  • Construction period: October 2017 – end of 2020
  • Formwork service life: Approx. 12 months
  • Shoring duration of use: Approx. 8 months

現場でのニーズ

  • Climbing protection wall for safe working at the edge of the slab
  • Optimized construction site logistics due to lack of storage space and time savings
  • Economical solution for the creation of the building cantilevers
  • Complex building geometry

顧客名

STRABAG AG

提案内容

  • RCS-P Climbing Protection Wall covers 2.5 floors
  • Pre-assembly of wind shields, climbing platforms and shoring towers in the PERI Nußdorf branch
  • PERI InSite Construction – Solution for optimal concreting:
    • More safety during concreting through monitoring of the concrete strength
    • Time saving through simple and fast determination of the water-cement ratio
    • Precise temperature determination reduces crack formation and thus increases concrete quality
    • The concreting process is controlled in real time
  • VST Heavy-Duty Shoring Towers in combination with PERI UP Scaffolding to transfer the high loads in the area of the building cantilevers
  • BIM 360 Field
    • Cost and time savings
    • Quality improvement and visualization of the planning
    • Collision check