TrIIIple, Vienna, Austria
プロジェクト情報
ロケーション: Vienna, オーストリア
- Building height:
- Building height tower 1: 120 m / 33 upper floors
- Building height tower 2: 110 m / 30 upper floors
- Building height tower 3: 123 m / 34 upper floors
- Construction period: October 2017 – end of 2020
- Formwork service life: Approx. 12 months
- Shoring duration of use: Approx. 8 months
現場でのニーズ
- Climbing protection wall for safe working at the edge of the slab
- Optimized construction site logistics due to lack of storage space and time savings
- Economical solution for the creation of the building cantilevers
- Complex building geometry
顧客名
STRABAG AG
提案内容
- RCS-P Climbing Protection Wall covers 2.5 floors
- Pre-assembly of wind shields, climbing platforms and shoring towers in the PERI Nußdorf branch
- PERI InSite Construction – Solution for optimal concreting:
- More safety during concreting through monitoring of the concrete strength
- Time saving through simple and fast determination of the water-cement ratio
- Precise temperature determination reduces crack formation and thus increases concrete quality
- The concreting process is controlled in real time
- VST Heavy-Duty Shoring Towers in combination with PERI UP Scaffolding to transfer the high loads in the area of the building cantilevers
- BIM 360 Field
- Cost and time savings
- Quality improvement and visualization of the planning