ロケーション: Incheon, 大韓民国

  • Construction of two new luxury residential towers in Incheon, South Korea, just a few kilometres from Seoul
  • Two buildings, each 40 storeys and 143 m high, housing a total of 351 residential units

現場でのニーズ

  • Project implemented on a tight construction schedule
  • High safety requirements due to strict government guidelines
  • Efficient construction work with low personnel costs
  • Use of innovative solutions in the field of climbing technology

顧客名

POSCO E&C Co. Ltd, Yeongnam, South Korea

お客様にとっての価値

  • Straightforward assembly of the climbing system thanks to intuitive plug-and-play configuration
  • Reduction in personnel costs due to straightforward assembly of the climbing brackets without the need for specialist personnel
  • Increased safety due to elimination of exposed building edges by means of decentralised hydraulic units that facilitate synchronised climbing of all platforms
  • Safe work operations even at great heights thanks to an enclosure solution consisting of a combination of RCS MAX with the RCS P Climbing Protection Panel
  • Climbing process stopped automatically in the event of a collision or overload
  • Full control and monitoring of the climbing process using the display attached by cable to the RCS MAX unit
  • Quick and straightforward problem recognition using light signals on the unit and indications on the display
  • Shorter climbing cycles and reduction of downtime thanks to load transfer to the lower climbing section
Construction Manager
Jeong-Soo Kim
Construction Manager

The PERI RCS MAX system proved to be an exceptionally safe, fast and cost-effective system on our construction site. Compared to split panel systems, it enabled us to achieve our highly stand­ardised level of construction quality. What’s more, RCS MAX is very fast and quiet, so we were even able to climb at night despite being in a residential area. I highly recommend the RCS MAX system to clients looking for safe, fast and cost-effective constructions options.

提案内容

  • Planning and delivery of a climbing formwork solution on the basis of the RCS MAX Rail Climbing System, taking into account the rigorous safety concept
  • RCS MAX Climbing Solution comprising a total of 84 console brackets with 84 RCS MAX Hydraulic Units for both buildings
  • Largely hydraulically operated climbing formwork and protection panel solution
  • Project support throughout construction process