You are on PERI's international website. Click here to switch to PERI USA. Click here to view all PERI websites.

Air traffic control tower at Buenos Aires-Ezeiza Airport, Buenos Aires, Argentina

プロジェクト情報

ロケーション: Buenos Aires, アルゼンチン

  • New air traffic control tower at Buenos Aires-Ezeiza Airport for visual monitoring and control of air traffic
  • The tower has a surface area of 7,000 m², is 108.40 m high and has a 360° field of vision over the entire airport complex
  • Unusual geometry consisting of shaft, crown and vertical pipe-in-pipe structure

現場でのニーズ

  • Provision of complex spectrum of coordinated formwork and scaffolding solutions
  • Detailed, preliminary analysis of the geometry of the external core which varies from level to level from level five upwards
  • Development and evaluation of tailor-made special-purpose solutions
  • Surface formed with flawless architectural concrete in accordance with standards

顧客名

Niro-Riva UTE

お客様にとっての価値

  • Individual analysis and planning by PERI engineers using a 3D model
  • Project-specific, special-purpose formwork using plywood panels cut-to-size with millimetre precision
  • Construction site personnel assisted on a continuous basis by on-site PERI support staff
  • Comprehensive PERI solution using perfectly coordinated formwork and scaffolding materials from a single source
  • Swift progress of construction works in two-week concreting cycle
  • High level of working safety
  • First-class architectural concrete quality
A portrait of Agustina Fernandez, Site Manager at Niro-Riva UTE
Ing. Agustina Fernandez
Site Manager

The final result speaks for itself: The PERI employees were always willing to rise to the complex challenges. We were able to bring this project to a successful conclusion and adhere to the demanding quality standards as a result of our collaboration with both the PERI Engineering Office and the production department.

提案内容

  • Comprehensive solution with project-specific, adapted formwork and scaffolding materials
  • Use of CB Climbing Formwork combined with the VARIO GT 24 Girder Wall Formwork to create the internal core which extends vertically upwards
  • Creation of a 3D planning model and PERI special-purpose formwork for the external pipe
  • Cut-to-size plywood panels using CNC cutting and special assemblies
  • Preliminary in-house testing of the special-purpose formwork at PERI sites
  • Installation of the five cantilevered platforms using MULTIFLEX Girder Slab Formwork combined with components of the VARIOKIT Engineering Construction Kit, PERI UP Flex and other slab props
  • Assembly of safe working platforms consisting of PERI UP Flex working platforms supported by system components of the VARIOKIT Engineering Construction Kit and a Brace Frame SB-2
  • On-site project support provided by PERI supervisors