- New air traffic control tower at Buenos Aires-Ezeiza Airport for visual monitoring and control of air traffic
- The tower has a surface area of 7,000 m², is 108.40 m high and has a 360° field of vision over the entire airport complex
- Unusual geometry consisting of shaft, crown and vertical pipe-in-pipe structure
現場でのニーズ
- Provision of complex spectrum of coordinated formwork and scaffolding solutions
- Detailed, preliminary analysis of the geometry of the external core which varies from level to level from level five upwards
- Development and evaluation of tailor-made special-purpose solutions
- Surface formed with flawless architectural concrete in accordance with standards
顧客名
Niro-Riva UTE
お客様にとっての価値
- Individual analysis and planning by PERI engineers using a 3D model
- Project-specific, special-purpose formwork using plywood panels cut-to-size with millimetre precision
- Construction site personnel assisted on a continuous basis by on-site PERI support staff
- Comprehensive PERI solution using perfectly coordinated formwork and scaffolding materials from a single source
- Swift progress of construction works in two-week concreting cycle
- High level of working safety
- First-class architectural concrete quality
Ing. Agustina Fernandez
Site Manager
The final result speaks for itself: The PERI employees were always willing to rise to the complex challenges. We were able to bring this project to a successful conclusion and adhere to the demanding quality standards as a result of our collaboration with both the PERI Engineering Office and the production department.
提案内容
- Comprehensive solution with project-specific, adapted formwork and scaffolding materials
- Use of CB Climbing Formwork combined with the VARIO GT 24 Girder Wall Formwork to create the internal core which extends vertically upwards
- Creation of a 3D planning model and PERI special-purpose formwork for the external pipe
- Cut-to-size plywood panels using CNC cutting and special assemblies
- Preliminary in-house testing of the special-purpose formwork at PERI sites
- Installation of the five cantilevered platforms using MULTIFLEX Girder Slab Formwork combined with components of the VARIOKIT Engineering Construction Kit, PERI UP Flex and other slab props
- Assembly of safe working platforms consisting of PERI UP Flex working platforms supported by system components of the VARIOKIT Engineering Construction Kit and a Brace Frame SB-2
- On-site project support provided by PERI supervisors