Research and Development Centre of Ferring Pharmaceuticals A/S, Copenhagen, Denmark

プロジェクト情報

ロケーション: Copenhagen, デンマーク

  • New research and development centre of Ferring Pharmaceuticals A/S in Copenhagen
  • Triangular building with exacting architectural concrete requirements
  • Central location right next to the sea at the Øresund crossing between Copenhagen and Malmö
  • An 8 storey-high building; two storeys below ground level and six above ground

現場でのニーズ

  • Simultaneous construction of multiple storeys with short lead times
  • Exacting architectural concrete requirements
  • Accurate profiling for the architectural design

顧客名

MPNM - MANGIAVACCHI PEDERCINI and NESSI & MAIOCCHI

お客様にとっての価値

  • Lower manufacturing costs and valuable reduction in assembly time on the construction site due to multiple formwork element applications
  • Flexible slab formwork solution even at great supporting heights
  • Valuable reduction in working time thanks to transportation of large-scale formwork units by crane
  • Timely delivery of large volumes of material
  • Safe working conditions at any height thanks to stable, trip-proof PERI UP Flex working platforms that can be optimally adapted to project-specific geometries
  • Prevention of frictional loss between acting companies thanks to a solution that ensured that project planning, material provision and project services came from a single source
  • A perfectly coordinated solution comprising a shoring system and slab formwork
Portrait of Stefano Borroni, Construction site manager at MPNM Byggeri Aps
Stefano Borroni
Construction site manager

PERI systems provide numerous benefits on the construction site and meet all safety requirements. Using these systems speeds up the construction process and ultimately enables us to achieve a high level of quality.

提案内容

  • Simultaneous use of various PERI systems on the construction site to complete the walls and ceilings not to mention the use of scaffolding technology and provision of project support on site
  • Just-in-time delivery of large volumes of material despite short lead time
  • Constant on-site support so as to optimise work processes at the construction site