Sie befinden sich auf der internationalen PERI Webseite. Lokale Informationen finden Sie auf der Webseite von PERI Deutschland. Alle PERI Webseiten im Überblick.
You are on PERI's international website. Click here to switch to PERI USA. Click here to view all PERI websites.
Faculty of Governance, Economic and Social Sciences, Mohammed VI Polytechnic University, Rabat, Morocco
Mohammed VI Polytechnic University, Rabat
写真
1
/
6
プロジェクト情報
ロケーション: Rabat, モロッコ
Support during the construction of the new campus of the Mohammed VI Polytechnic University (UM6P) in Rabat, Morocco
Inauguration of the new campus in September 2021 after a shell construction time of around
現場でのニーズ
Highest safety requirements
Tight construction schedule of around nine months
Limited crane availability
24-hour operation in three shifts
顧客名
SOGEA MAROC (VINCI Group)
お客様にとっての価値
Rapid cycle sequences and fast construction progress
Compliance with high safety standards thanks to integrated PERI safety features
Smooth-running construction site processes
Time and cost savings thanks to formwork processes requiring only limited use of a crane
Comprehensive protection through PERI UP Scaffolding System with comprehensive, end-to-end lateral protection, and non-slip decks
Less coordination work thanks to continuous support from PERI
提案内容
Formwork and scaffolding from a single source with an integrated safety concept including additional measures that go beyond the safety solutions already integrated into PERI products
A total of 2,000 m2 of ALPHADECK Slab Formwork for around 120,000 m2 of slab area
Systematic shuttering and striking from the lower level
Easy handling of the ALPHADECK Slab Formwork with only a few system components
Early striking and rapid cycle sequences thanks to the ALPHADECK Drophead System
Efficient erection of the foundation with lightweight LIWA and HANDSET Alpha hand-set formwork
Scaffolding solution with 600 t of PERI UP Scaffolding material used as supporting, working and access scaffolds
Optimally coordinated logistics processes with just-in-time material delivery
Immediate material availability
Extensive project support with daily monitoring of the construction site