Tošanovice-Žukov Bridge, Czech Republic

プロジェクト情報

ロケーション: Ostrava, チェコ共和国

Design: steel composite bridge
Length: 720 m

現場でのニーズ

The strut axes open out from 6.50 m to 9.00 m in the centre of the bridge.

顧客名

Metrostav a.s., Division 4, Prague

お客様にとっての価値

  • flexible connecting possibilities for steel walers, scaffold tubes, heavy-duty spindles and tie rods
  • can be adapted to various main beam spacings
Martin Šimek, Site Manager
Martin Šimek
Site Manager

The erection of steel composite bridges is considerably easier and much faster with the PERI formwork carriage construction.

提案内容

Two modular formwork carriages from the VARIOKIT system