Lötschberg Tunnel, Switzerland

プロジェクト情報

ロケーション: Mitholz, スイス

35 km railway tunnel in mining construction technique. The mining-type tunnel driving with a total of almost 16 million tons of excavated material was carried out with tunnel drilling machines (20%), and 80% was blown up.

Construction time until commissioning: 1999 - 2007

現場でのニーズ

Tunnel cross section of a width of 15.74 m and a height of 12.54 m

顧客名

Schweizer Alp Transit Consortium (SATCO)

お客様にとっての価値

Adaptable tunnel modular construction kit suitable for the jobsite

Albin Matschek
Site Supervisor

PERI offered the most efficient solution for our jobsite. The adaptable PERI modular construction kit for the jobsite with pre-assembled units excellently fulfilled all our requirements.

提案内容

  • one tunnel formwork carriage for wall and slab
  • hydraulically operated formwork carriage structure
  • formwork carriage mobile via chain block