Kičevo Podvis Motorway Bridge, North Macedonia

プロジェクト情報

ロケーション: Kičevo Podvis, マケドニア

  • New bridge construction as part of the expansion of the North Macedonia motorway network
  • 381 m long bridge with separate carriageway slabs
  • Radial bridge superstructure with a 165 m span

現場でのニーズ

  • Construction of a 381 m long bridge in challenging terrain
  • Cost-effective execution of the complex superstructure geometry with different bridge cross-sections, superstructure heights and longitudinal as well as lateral inclinations
  • Project-specific execution and logistics solution for the constructing the superstructure along with the bridge piers within a very tight construction schedule

顧客名

GD Granit, Skopje, North Macedonia

お客様にとっての価値

  • Time-savings through simple, fast adaptation of the balanced cantilever equipment to suit the changing bridge cross-section
  • Reduced working time thanks to fast shuttering and striking operations with one hydraulic solution
  • Reduced crane time due to independent moving procedure of the VBC Cantilevered Construction Carriages
  • Economical solution through the rentability of the system components
  • Continuously optimised workflows through on-going site support
  • Simple communication process due to the execution and logistics solution from a single source
Portrait of Goran Milanovic, Project Manager and Ivana Dimitrova, Site Manager at GD Granit
Goran Milovanović and Ivana Dimitrova
Project Manager and Site Manager

Together with the PERI expert team of engineers, we quickly defined the technical solutions for the realization of the bridge project. Extremely important to us was the on-going site support when the VARIOKIT was being used.

提案内容

  • Project-specific cantilever construction solution based on the VARIOKIT Engineering Construction Kit for the execution of the bridge superstructure
  • Parallel use of four balanced cantilevered carriages for accelerating execution times
  • Individually-adapted climbing formwork solution for cost-effective construction of the bridge piers
  • Just-in-time delivery of the required formwork and scaffolding materials
  • Continuous on-site support in order to optimise work operations