  • Passenger airport opened in 2018, north-west of Istanbul
  • Can accommodate 90 million passengers annually with possibility to expand this to 200 million passengers  
  • Two gigantic terminal buildings with the first one alone providing 1.44 million m² of usable space
  • With six runways, the new airport is set to overtake Hartsfield–Jackson Atlanta International Airport as the world´s largest airport in the next ten years

現場でのニーズ

  • Simultaneous construction of diverse facilities with short lead times
  • Processing of slab area totalling 220,000 m² at heights of up to 17.50 m
  • Realisation of walls and slabs up to 14 m high with a thickness of up to 1.75 m
  • Work operations carried out on 15,500 m² of platforms at heights of up to 40 m
  • Tight schedule and high demands placed on material quantities

顧客名

IGA Havalimanları İnşaatı Adi Ortaklığı Tic. İşletmesi, Istanbul, Turkey

お客様にとっての価値

  • Reduction in construction costs and saving of valuable assembly time on the construction site through mulitple use of the formwork elements
  • Flexible slab formwork solution also for the large support heights
  • Punctual deliveries of large amounts of materials
  • Valuable working time savings through the possibility of moving large-sized TRIO formwork units
  • Safe working conditions at all heights due to the stable and tripping hazard-free surfaces of the PERI UP Flex working platforms along with optimum adaptability to suit project-specific geometries
  • Avoidance of any frictional loss between the contractors thanks to the solution provided for planning, material availability and services from one source
Portrait of Nahit Çetin, General Manager at IGA Havalimanları İnşaatı Adi Ortaklığı Tic. İşletmesi, Istanbul, Turkey
Nahit Çetin
Deputy General Manager

With the support of PERI, we completed the work on the suspended slabs well before the deadline; a huge win in our race against time - in a very safe working environment.

提案内容

  • Parallel use of various PERI system on site for walls, columns and slabs as well as use of scaffolding technology along with on-site project support
  • PERI UP Flex shoring supported a total of 15,500 m² LGS Working Platforms for processing slab areas totalling approx. 220,000 m²
  • Just-in-time deliveries of large quantities of materials in spite of short lead times
  • On-site support provided by PERI engineers and supervisor from the very beginning