Expressway S3 Legnica – Lubawka, Poland

プロジェクト情報

ロケーション: Lubawka, ポーランド

  • Expressway S3 in the west of Poland with a total length of 480.70 km
  • Support from PERI in the section between Legnica and Lubawka featuring three bridges with two superstructures each
  • Different bridge lengths between 435.00 m and 589.00 m as well as different radii

現場でのニーズ

  • Tight construction schedule
  • Adherence to the weekly cycle
  • High demands on the concrete surface of the bridges
  • High level of safety at work

顧客名

Contractor

Konsorcjum Mosty Łódź S.A. & ONDE S.A.

Field Service

PERI Poland

お客様にとっての価値

  • Adherence to the specified weekly cycle
  • Reduced material quantities and time-saving handling
  • No additional alignment of the external formwork thanks to the striking mechanism of the VARIOKIT Rafters
  • Precisely fitting geometric adaptation and quick assembly
  • Time and cost saving
  • High level of working safety
  • Efficient assembly of the scaffold with a low number of components and work steps
  • Comprehensive on-site field service from PERI
Wojciech Putowski, Bridge Construction Manager, Konsorcjum Mosty Łódź S.A. & ONDE S.A.
Wojciech Putowski
Bridge Construction Manager

The VARIOKIT Incremental Launching Facility is particularly easy and quick to operate, leaving the workers more time for other jobs on the construction site. The forming process itself is also particularly fast – we were able to move the 25.00-m-long formwork into position within 30 minutes. We are very satisfied with the system and we have also been able to rely on PERI’s support at any time.

提案内容

  • Concreting in different numbers of concreting sections spanning 25.00 m each
  • VIL Wall Support with Roller Drophead for slab formwork in the trough
  • The shuttering method of the VIL System allowed the slab formwork to be moved independently into the concreting position by way of pulling – alignment of the 25.00-m-long slab formwork within half an hour for the new cycle
  • Forming the bridge piers with VARIO GT 24 Column Formwork
  • Use of the PERI UP Scaffolding System as stair towers, reinforcement scaffolds and working platforms
  • PERI Field Service