Support for the construction of the 2.90 km long Čortanovci Viaduct within the Budapest-Belgrade-Skopje-Athens international railway link
The viaduct is located on the section between Stara Pazova and Novi Sad as part of the double-track, open railway line and is supported by 59 columns
The bridge is divided into a total of five sections A to E, whereby PERI was significantly involved in the construction of sections B and C
現場でのニーズ
Realisation of the project within the tight construction schedule
High load transfer with support heights of up to 24.00 m
Use of a crane
Efficient work with high level of safety for site personnel
顧客名
Main Contractor
RZD International
Subcontractor
Karin Komerc MD
お客様にとっての価値
Substantial simplification of assembly work due to the possibility of combining PERI systems on the basis of the modular principle in the common, metric basic grid
Project-specific adaptation to geometries and loads in 25 cm steps
Force-fit connections and flexible connection points when combining scaffolding and formwork solutions
Time-saving relocation of the permanently mounted climbing units by crane lift
Fast work due to simplified planning and assembly of the standardised, coordinated components
Realisation of the project within the tight construction schedule
Increased safety for construction site personnel
Individual planning, consulting and support on site by PERI engineers
提案内容
Flexible combination of PERI UP as well as components from the VARIOKIT Engineering Construction Kit for realising the 18.50 m high delta piers
Erection of the columns using CB Climbing Units as working platforms in combination with the TRIO and VARIO GT 24 Wall Formwork Systems
Use of MULTIFLEX Girder Slab Formwork for concreting the two-lane superstructure
Support of the MULTIFLEX by PERI UP with a support height of 20.00 m in section C
Installation of ALPHAKIT Towers and Lattice Girders for load transfer as well as the creation of horizontal working platforms in section B
Assembly of the lightweight ALPHAKIT system components on the ground and by hand: crane use only required for positioning
Use of PROKIT EP 110 Guardrail to protect against open building edges
Advance planning and support for system implementations