Calgary Cancer Centre, Calgary, Canada
プロジェクト情報
ロケーション: Calgary, カナダ
- Construction of the Calgary Cancer Centre, a state-of-the-art cancer treatment and research centre in Calgary, Canada
- In terms of the volume of material on site, the largest construction project PERI has ever taken on
- Complex building structure covering a total area of around 185,000 m2 with varying storey heights
- A total of 18 storeys, 5 of them below ground level and 13 above ground
- Unusual shape of the building: A child and an adult embracing each other and breathing as one
- Scheduled for completion in 2023
現場でのニーズ
- An efficient and safe formwork and scaffolding solution in order to realise the complex design of the building
- Storey heights varying between 4 and 7 m
- Cantilever from level 4 upwards, which extends from the building by about 9 m
- Consideration of the restricted assembly space on site
顧客名
PCL Construction Management Inc.
お客様にとっての価値
- A complex formwork and scaffolding solution from a single source
- A flexible slab formwork solution that can also be used to create varying storey heights and cantilevers
- Optimal coordination, execution and logistics thanks to planning phase carried out conjointly with the client
- Efficient work procedures and training of construction site personnel using 3D models and 4D timetables
- Just-in-time delivery of material in order to cut costs and account for the limited amount of space available
提案内容
- A combination of 14 different PERI system solutions with more than 15,000 m2 of slab formwork, 4,000 m2 of wall formwork, a complex VRB solution and extensive scaffolding material
- Use of the SKYDECK slab formwork to construct the underground garage
- The most complex SKYTABLE project structure ever implemented to form the above-ground portion of the building: A total of 247 SKYTABLE slab tables involving 218 different designs
- Just-in-time delivery of pre-assembled slab tables and subsequent erection using pre-assembled girders
- VRB solution to create the cantilever: 36 VRB girders with a length of 22 m assembled to form 18 truss girder packages with platform units to enable casting of the slab above
- The first time that TRIO TRS 120 columns have ever been used. These are used in conjunction with the TRIO TRS 90 columns
- Construction site support through development of a 3D model and 4D timetable