You are on PERI's international website. Click here to switch to PERI USA. Click here to view all PERI websites.

Bahnhofplatz 2, Zurich, Switzerland

プロジェクト情報

ロケーション: Zurich, スイス

  • General refurbishment of the building built around 1890 within several construction phases
  • Installation of a pedestrian tunnel with a width of 4.00 m and a height between 3.20 and 4.20 m
  • Fabrication of a steel construction platform with debris protection at a maximum available passage height of 4.20 m and a length of 7.50 m to be bridged
  • Scaffolding of the complex facade with balconies, window niches and projecting frescoes at different heights

現場でのニーズ

  • Adherence to the short assembly window for the pedestrian tunnel between 01:00 and 04:30 a.m.
  • Ensuring that pedestrians could pass through the highly frequented location without obstacles at all times
  • Simple, safe and lean implementation of the steel construction platform with low clearance height
  • Flexible scaffolding solution to cope with the tight space conditions as well as the complex facade
  • High demands on work, cost and planning security
  • Smooth project flow and simplified communication with different decision-makers and trades

顧客名

Client

PSP Properties AG, Zug, Schweiz

Site Management

Wanner + Frankhauser AG, Zürich, Schweiz

Scaffolding Company

Meier + Ritter AG, Regensdorf, Schweiz

Field Service

PERI Schweiz, Ohringen   

お客様にとっての価値

  • Efficient building refurbishment without deviation from planning and time programme through the use of the PERI UP Scaffolding Kit in connection with the VARIOKIT Engineering Construction Kit
  • Increased transparency and increased efficiency by means of the BIM methodology supported by PERI
  • Work sequences in an ergonomic posture thanks to clip-on internal console brackets and connected console brackets from PERI UP
  • Time and cost savings during assembly and dismantling of the scaffolding due to coupling-free assembly
  • Continuous attention to occupational health and safety through system-integrated safety features
Yasar Bülbül
site manager Wanner + Frankhauser AG

In the planning phase, the 3D drawings were used to review all the necessary access points in detail and to discuss the interfaces with the various trades. The assembly process then went smoothly without any deviations from the plans or schedule – so it was a win-win for everyone involved. PERI UP facade scaffold makes you feel safe!

Muhammed Mehmedi
site manager Meier + Ritter AG

The scaffolding team quickly got to grips with our new scaffolding system and assembled it flawlessly based on the 3D drawing. This saved time and cut costs. Thanks to the digital planning system, we knew exactly which parts we needed for which construction phase and also how much manpower was required.

Rebecca Böll
Managing Director Meier + Ritter

I am proud of our system transition and look forward to seeing what the future holds for scaffolding construction!

提案内容

  • Digital 3D planning for the visualisation of the required scaffolding systems as well as for logistics planning, which was urgently required for the tight time window
  • Combination of the flexibly adaptable PERI UP facade scaffolding in modular construction with SRU girders to realise the 4.00 m passage width of the pedestrian tunnel
  • Compliance with the specifications for working safety through the use of PERI UP facade scaffolding with integrated advanced guardrail
  • Implementation of the steel construction platform with rubble protection using standard parts of the PERI UP Scaffolding Kit as well as the VARIOKIT Engineering Construction Kit with RCS climbing rail and an SLS spindle
  • Coping with the tight space, transport and storage conditions using the small-volume PERI UP facade scaffold in a stemmed construction
  • Scaffolding of the complex facade including circular scaffolding using flexible components of the PERI UP Scaffolding Kit